
21
4.6 Applying Self-Levelling Cement
Fig. 4.6
Measure the cable’s electrical and insulation resistance and record the
readings on line 3) Before embedding the heating cable in self-levelling
cement of the measures’ table.
• Consult the manufacturer’s instruction for the type of floor covering (ceramic,
linoleum, or other). See Section 7, ”Expert Tips”;
• Completely embed the heating cable in self-levelling cement (Fig. 4.6). It is crucial
that the ENTIRE cable be embedded. No part of the cable must be exposed;
• Level the subfloor with self-levelling cement or cover the cable with a layer of
cement glue when installing the stones or ceramics.
IMPORTANT!
Do not turn on the EFMA floor heating system before the cement has completely
dried. Follow the manufacturer recommandations (may take up to 30 days, depending
on the product).
Once the cement or binder has dried, measure the cable’s electrical resistance
and record readings on line 4) After embedding the heating cable in cement
of the measures’ table.
Содержание EFMA
Страница 1: ...INSTALLATION GUIDE EFMA Floor Heating System By www rezspec com Oct 2011 Edition...
Страница 2: ......