INSTALLATION

Install the evaporative cooling module as follows. Item numbers in parentheses refer to 

Table 1

.

⚠ CAUTION ⚠

 

• DO NOT mount the cooling module directly on soft tar roofs where the legs could sink and tilt 

the cooling module. Provide a weather-resistant solid wood or metal base under the cooling 

module support base.

 

• DO NOT install the cooling module and connecting duct while blowers are in operation.

NOTE:  Before installation, make preparations for necessary supplies, tools, and manpower.

Pre-Installation Checklist

 

‰

Ensure that installation complies with all local, utility, and federal building and safety codes and regulations.

 

‰

Check module for shipping damage. If damage is found, document it with transporting agency and immediately 

contact Distributor.

 

‰

If module is being installed indoors (model SSCBL, PGBL, or ADF/ADFH 700/1200), outside makeup air must 

be provided.

 

‰

If optional shipped-separate equipment is required (i.e., drain and fill kit, freeze protection kit, moisture elimination 

pads, and/or water hammer arrestor), check to ensure that these parts are available for installation.

 

‰

Ensure that there is adequate clearance between bottom of reservoir and roof or platform to allow for drain and 

overflow pipe connections (refer to 

Dimensions

 section).

 

‰

Ensure that roof or platform is capable of handling additional load of cooling module with full reservoir (refer to 

Weights

 section).

 

‰

Ensure that mounting surface for cooling module is level and free of debris.

Assemble Base

Refer to 

Figure 2

.

1.  Assemble all four legs:

a.  Secure each two-piece leg (3) together using four bolts (9) and nuts (10).
b.  Top flange of assembled legs should be level with bottom of system cabinet. Adjust legs to proper height and 

securely tighten bolts and nuts. Leg height is adjustable from 9–16 inches (229–406 mm).

c.  Position four assembled legs approximately 2 feet (610 mm) from air inlet side of cabinet in rectangular 

pattern corresponding to size of cooling module. Check again to ensure that top of legs are level with bottom 

of makeup air system cabinet.

Figure 2.  Base Assembly (Refer to 

Table 1

)

3

2

1

Содержание AS3

Страница 1: ...ling modules require outside air TABLE OF CONTENTS GENERAL INFORMATION 1 Dimensions 2 Weights 2 INSTALLATION 3 Pre Installation Checklist 3 Assemble Base 3 Install Evaporative Cooling Module on Base 4...

Страница 2: ...1 Evaporative Cooling Module Installation Components Item No Component PN Quantity Application 1 End rail 107235 2 Base assembly 2 Side rail 107227 2 3 Two piece leg 107236 4 4 Front top cover 107228...

Страница 3: ...drain and fill kit freeze protection kit moisture elimination pads and or water hammer arrestor check to ensure that these parts are available for installation Ensure that there is adequate clearance...

Страница 4: ...odule with both ends supported and place it on base assembly Ensure that module is level and that all base assembly bolts are secure 2 Install top front cover 4 and secure using 13 screws 8 three per...

Страница 5: ...oling module using screws 8 five per side 4 Secure transition duct flange to front top cover 4 using seven screws 8 5 With cooling module and transition duct properly positioned on blower cabinet tigh...

Страница 6: ...ure 6 a Install two catch pad clamps to one side of cooling module s front legs and secure clamps through legs into clamp using four screws 8 b Assemble catch pads together using three screws 8 NOTE T...

Страница 7: ...rection Through Media Pads Pump Junction Box Assembly Installation NOTE To avoid damage during shipping the pump junction box assembly is secured to the top of the side panel 1 Support pump junction b...

Страница 8: ...mp Junction Box Assembly Electrical Connections PUMP JUNCTION BOX ASSEMBLY OPERATING LOCATION Figure 9 Evaporative Cooling Module Factory Installed Wiring BL MODELS WITH 115 230 1 60 OR 230 460 575 3...

Страница 9: ...interfere with damper controls 5 Run wires up to electrical compartment remove plug from one bottom entrance hole and push tubing encased wires into electrical compartment Place other strain relief bu...

Страница 10: ...iddle outlet to supply water to cooling module reservoir b For drain two way valve connections connect drain pipe from reservoir to A and connect outlet side to B and connect into drain lines from coo...

Страница 11: ...dule All cooling modules are equipped with an overflow and drain fitting The fittings are in the cabinet bottom and come complete with a locknut and a sealing gasket Check these fittings for tightness...

Страница 12: ...ailure to do so can cause electrical shock personal injury or death CAUTION Do not flood the media pads with extreme quantities of water for long periods as this will cause premature breakdown of the...

Страница 13: ...iven temperature the media pads should completely wet from top to bottom dur ing the ON cycle The AquaSaver microprocessor has three preset timing settings based on media size The appropriate setting...

Страница 14: ...on Remove the water feed line from the downstream side of the ball valve and unscrew the water bleed line barbed hose fitting Force a fresh water supply up through the water inlet hose and thoroughly...

Страница 15: ...ow section 2 Dirty media pads Clean or replace media pads refer to Installation Replacement of Media Pads section D Water not distributing evenly 1 Distribution line clogged Flush distribution line re...

Страница 16: ...ustrations subject to change without notice or incurring obligations Latest version of this manual is available at www reznorhvac com 2022 Nortek Global HVAC LLC O Fallon MO All rights reserved OPT AS...

Отзывы: