Step 13A
Assemble Rear Gable
2x4 Block
D4
?)1%J@K%16,%@HSRDAG%8,'/3$%1,%'%*2(01"%,9%fTRDY@e4%W,$#1#,(%1"2$2%@HS$7%
on edge
%'(3%8)11%1,021"2/4
@4
W,$#1#,(%J@K%16,%XDR]YSe%*,(0%@HF$%'(3%J@K%16,%TDR]YXe%*,(0%@HF%8,'/3$%,(%1"2%@HS%-*'12$%'$
$",6(%82*,64%!"2%1,-%@HF%8,'/3$%"'B2%8*)2%&'/L$%,(%1"2%2(3$4%W,$#1#,(%1"2$2%2(3$%1,021"2/
'1%1"2%1,-4
Assemble the roof gables and trusses on the center of the loft floor. This
will make it easier to stand the gable upright over the lower wall.
2x4 Block
2x4 Block
71-3/8" Long
Truss Leg
2x4 On Edge
97-1/2" Long 2x4 On edge
188-1/2"
71-3/8" Long
Truss Leg
81-3/4" Long
Truss Top
Truss Knee
]4
<2+)/2%1"2%1/)$$%*20%1,%1"2%@HS%-*'12%6#1"
J@K%16,%@RDY@e%*,(0%32+L%$+/26$4
S4
=($1'**%ERDY@e%H%D@e%-*.6,,3%9#**2/$%,(%1"2
@HF%1/)$$%*20$%(2'/%@HS%6#1"%F3%+,&&,(
('#*$4%[H'+1%$-'+#(0%#$(G1%#&-,/1'(14
E4
<M)'/2%1/)$$4%V2'$)/2%3#'0,('**.%9/,&%1"2
L(22%,9%1"2%@HF%1/)$$%1,%1"2%8,11,&%+,/(2/
,9%1"2%@HS%-*'124%!"2%&2'$)/2&2(1$%6#**%82
1"2%$'&2%JDXXRDY@eK%6"2(%1"2%1/)$$%#$%$M)'/24
F4
?)1%@HS%/2&,B23%9/,&%3,,/%,-2(#(0%#(1,
Xe%*,(0%8*,+L$4%!'+L%('#*%,/%$+/26%1"2%8*,+L$
'/,)(3%1"2%-2/#&212/%,9%1"2%0'8*2%9/'&2%1,
-/2B2(1%1"2%0'8*2%9/,&%&,B#(04