Step 12B

Install Gable Siding continued

Step 13

Install Gable Overhang

`4

=($1'**%*'$1%$#3#(0%-'(2*4

i4

=($1'**%+2(12/%$#3#(04%=9%.,)%-)/+"'$23%'%$)(8)/$1%6#(3,6%.,)%&'.%+)1%1"2%,-2(#(0%#(%1"2

$#3#(0%'1%1"#$%1#&24%=($1/)+1#,($%'/2%-'+N23%#(%1"2%6#(3,6%8,F4%=1%#$%'3V#$'8*2%1,%#($1'**%1"2
6#(3,6%'912/%1"2%0'8*2%#$%$21

30-3/4" Long 2x4

77-3/8" Long 2x4

Do not remove the temporary 1x4 blocks until
the roof trusses and back gable are assembled.

B4

U,+'12%X@Y%16,%ffGihCd%*,(0%@F`%/'912/$%,(%0'8*24%=($1'**%@F`$%9*)$"%6#1"%1"2%1,-%,9%0'8*2

9/'&24%5$2%BA3%$#(N2/$4

@4

U,+'12%X@Y%16,%iAGBh`d%*,(0%@F`%/'912/$%'(3%#($1'**%1,%9#(#$"4%@F`$%6#**%2F12(3%82.,(3%2(3%,9

0'8*24

Содержание Best Barns Springfield

Страница 1: ... 7 1 1 82 237 6 2 17 6 1 1 2 1 9 2 3 3 0 12 7 4 0 1 ABC the Springfield Revised March 02 2021 Assembly Book Best Barns USA 3 0 D2 B E F AE Manufactured by Reynolds Building Systems Inc 205 Arlington Drive Greenville PA 16125 ...

Страница 2: ...cluded in kit 2O 23S 0 2 21 9 07 T M3027 9 0 26 7 L 1 R 1 S N7 302 2 1 I S 3 9 0 3 1 4 2 1 8 3 6 2 2 1 34 2 0 S O 2 G 9 2 2 1 _A 320 22 L 8 G 9 6 3 1 2 2 1 0 1 V2 1 L 12 G 3 8 11 F 23 1 9 2 6 2 L 12 G F 2 1 0 6 2 1 1 021 2 Q2 32 G 1 9 3 2 0 R G R 2 123 1 3 3 UJL G M302 9 3 0 1 1 V2 0 2 0 2 G M302 9 3 0 1 1 V2 23 R 0 D2S 5 N 12 a 0 D2 3 0 1 D2 3 1 24 6 N2 12 2 2 1 9 3 6 2 1 1234 2V 26 1 2 1 1 1 2 8...

Страница 3: ... F 2 4 C4 1 FC 9 0 V2 1 2 F 4 5 2 C3 0 V4 23 Cd 14 Material Description 12 x 20 F 2 123 N 0 4 CE F L g 1 Q2 32 4 CE F L g 1 Q2 32 4 B E F L I g 1 Bf 4 B E F 2 123 2 4 CE F 2 123 2 4 B E I 0 KhCd ih d C 4 FC Z V I i 84 C3 Z V D23 T2 N K 84 BW3 I 3 1 D2 B EGAd F AEGAd4 2 N 8 3 0 32 2 7 1 2 1 1 V2 1 024 I 212 87 1 2 2 1 2 8 2 821622 1 2 212 3 1 2 6 12 4 I 2 2 82 23 1 2 2 12 iGBh d 6 32 4 Details for ...

Страница 4: ...4 144 Wall Plate Pre Cut Wall Studs 4 1 XCY 2 0 1 2G 1 6 1 3 821622 1 2 1 a 8 11 12 4 1 3 1 6 12 6 1 BA3 N2 7 X Y 16 2 2 34 K4 1 X Y 16 2 3 0 2 4 9 2 2 1 1 2 1 2 9 6 1 1 2 2 3 9 1 2 9 24 4 1 1 2 9 1 3 0 2 6 1 1 2 EUJLE 2302 9 6 1 1 2 2 3 9 1 2 6 4 3 0 6 2F12 3 ih d 82 6 1 2 8 11 124 3 0 6 1 W3 0 V4 7 23 Cd 14 Tip use a 1x4 trim board as a gauge Siding Extends 3 4 Below Plate Siding Flush B4 1 X Y ...

Страница 5: ... 3 0 2 1 8 1 32 9 R 3 1 XBY 2 9 2 1 2 2 34 1 1 9 1 2 3 R 9 2 4 1 021 2 6 1 XB Y 162 V2 BA3 N2 23 2V2 2 324 4 2 2 1 1 2 8 2 XiY 1 22 2 BBWGBh d 0 6 9 2 4 2 3 0 6 82 23 912 1 2 6 2 21 1 2 9 4 B4 1 X Y 16 F GBAE 8 3 1 2 01 9 BBWGBh d4 L 1 1 2 8 3 1 021 2 3 3 12 6 1 EeE N 6 2 2 1 2 6 1 3 6 82 1234 4 H N E E 6 2 2 821622 9 1 16 1 3 N 4 292 2 23 12 12 4 i4 1 XWY F 2G 1 6 1 3 821622 1 2 1 a 8 11 12 6 1 X...

Страница 6: ...or Opening Siding Extends 3 4 Below Header Siding Extends 3 4 Below Plate 2x8 Door Header 75 1 2 Header Support nail nail B4 1 X Y 16 F GB E 8 3 1 2 01 9 B d 9 6 12 4 L 1 1 2 8 3 1 021 2 3 3 12 6 1 EeE H N 6 2 2 1 2 6 1 3 6 82 1234 i4 1 X Y 16 2G 1 1 3 1 2 01 9 fKGBh d 3 1 2 32 1 4 1 1 3 6 1 BA3 N2 4 4 1 1 2 3 2 32 1 2 F 2 32 1 4 1 1 2 1 3 6 1 BA3 N2 4 K4 2 V2 F 2623 1 1 2 214 H2 2 2 821622 2 32 3...

Страница 7: ...2 6 8 11 124 3 0 1 8 N 6 3 F 0 W3 0 V4 23 Cd 14 Step 5 Set Walls i4 1 X Y 9 2 3 0 2 4 U 1 2 6 2F12 3 F 12 iGBh d 1 6 9 2 1 2 2 V2 9 1 6 2 4 4 1 1 1 8 N 6 3 0 1 12 6 4 K4 M 2 1 9 1 6 2 3 2 2 2 6 1 BA3 N2 3 32 6 3 0 1 F 4 2 6 1 2G 1 6 1 3 4 W4 1 3 2 V2 8 11 F 9 3 2 04 f4 6 1 9 1 0 8 11 124 2 BA3 N2 d 14 Back Wall Siding Extends 3 4 Below Plate Cut 2x4 Plate from Opening Tip If you are erecting build...

Страница 8: ... 2 12 32 6 4 i4 1 X Y 16 B E 0 F 1 9 1 821622 32 6 1 2 12 3 1 9 1 3 8 N 6 4 Cut 2x4 12 to Fit 2x4 8 Tie Plate Step 7 Install Metal 2x4 Joist Hangers 1 XBCY 2 0 122 F b 1 02 0 23 6 1 1 2 6 1 3 8 1 32 6 4 5 2 1 F 8 N 0 02 1 2 2 1 2 F 7 1 23 2F1 12 7 6 82 9 6 1 1 2 1 9 1 2 F 1 2 12 6 2 1 234 2 2 1 2 02 6 1 BGBh d 02 4 2x4 Gauge Block 2x4 8 Tie Plate Cut 2x4 12 to Fit ...

Страница 9: ...s make sure the side walls are plumb The building width should be 12 0 measuring from the outside of the 2x4 tie plates 4 x 8 1 X_Y 2 F GB E 8 3 1 2 01 9 Bifd 3 1 1 2 21 02 4 5 2 BGBh d 02 4 Before installing floor sheathing consider where to locate the 2 x 4 access opening The detail below shows one possibility Regardless of desired layout it is important to install sheathing staggered when possi...

Страница 10: ...1 1 2 9 1 6 2 4 Step 9B Install Loft Floor Sheathing continued Siding Filler OSB Filler B4 U 12 XiY 1 22 d F CGih d 9 2 1 4 1 2 2 1 9 1 2 3 0 1 2 8 N 6 4 5 2 W3 0 V4 4 4 1 X Y 16 __d 0 BFi 6 12 2 1 8 3 2 1 1 1 2 8 N 6 4 1 2 01 1 9 6 1 1 9 R 9 2 3 8 11 9 3 04 1 1 9 6 1 1 2 3 0 1 2 32 6 4 5 2 W3 0 V4 23 B d 1 1 1 1 4 B4 U 12 X Y 9 iGBh d F d R 9 2 4 1 1 9 1 3 8 N 2 1 9 F 1 2 12 4 5 2 X Y 9 W3 2 4 2 ...

Страница 11: ... 2 2 1 1 021 2 6 82 64 2 0 23 2 1 1 2 8 11 F 6 82 1 0 1 3 2 2 B EGAd 9 2 3 1 2 34 Pre built gable ends highlighted in gray i4 2 1 N BF 8 N 1 91 9 0 3 1 2 9 2 2 82 4 2 2 8 N 6 82 CdGB d 0 3 V2 0 23 2 3 4 H N2 2 X Y 16 9 1 2 2 8 N 2 1 23 32 2 2G8 1 0 8 2 2 3 9 2 6 4 L 1 1 2 2 1 9 1 2 8 N 12 23 1 3 F 24 2 2 6 2 1 1 1 2 3 0 8 2 2 8 1 2F 1 1 2 24 TR R 8 N 1 0 8 24 4 2 2 1 2 8 11 F 1 1 2 0 8 2 1 3 0 X Y...

Страница 12: ...2G 1 0 8 2 3 04 N 0 291 1 0 1 1 3 0 2 6 1 E1 0 2E 2302 0 0 1 324 1 9 6 1 2 3 9 9 2 3 2F12 3 0 ih d 82 6 1 2 8 11 F 124 5 2 W3 0 V4 23 Cd 14 K4 U 12 X Y 16 KAGih d 0 F 4 1 1 2 2 2O 23 9 2 12 9 1 2 0 8 24 2 2 1 2 8 11 F 1 1 2 0 8 2 1 3 0 X Y 16 GBh d 26 2 4 W4 1 6 3 0 21 1 2 N4 J 0 2 821622 F 3 0 21 3 0 XB Y 9 122 W3 4 f4 U 12 X Y 16 KGBh dF fGih d 0 21 4 J11 1 2 2 1 1 9 2 0 8 2 1 3 1 2 2 1 1 2 i GB...

Страница 13: ... 24 1 1 2 N23 1 2 6 3 6 8 F4 1 3V 8 2 1 1 1 2 6 3 6 912 1 2 0 8 2 21 30 3 4 Long 2x4 77 3 8 Long 2x4 Do not remove the temporary 1x4 blocks until the roof trusses and back gable are assembled B4 U 12 X Y 16 ffGihCd 0 F 912 0 8 24 1 F 9 6 1 1 2 1 9 0 8 2 9 24 5 2 BA3 N2 4 4 U 12 X Y 16 iAGBh d 0 F 912 3 1 1 9 4 F 6 2F12 3 82 3 2 3 9 0 8 24 ...

Страница 14: ...2 64 4 11 X Y 16 ffGihCd 0 F 0 1 1 2 1 2 3 4 2 V2 1 2 BF 8 N 1 1 2 23 1 2 8 11 0 8 2 12 3 2 1 1 N22 912 0 234 U 12 BCGBh d 0 F 302 8 N 6 1 0 23 2 3 3 1 1 2 N4 2 2 912 3 302 8 N 1 2 N 6 1 6 3 0 214 1 6 1 XB Y 9 122 W3 3 0 24 i4 1 0 21 1 2 3 4 22 T21 J4 1 6 1 X AY 162 1 W3 3 0 24 4 29 9 1 V2 3 1 1 2 0 21 1 1 2 2 N4 K4 21 1 324 2 2 1 12 1 8 3 XCY 2 0 1 2 1 2 4 W4 2 V2 12 BF 8 N 4 Front Wall Step 15 A...

Страница 15: ... installed first This enables the soffit to rest on the trim where it meets the building See lower detail 99 Corner Trim 3 8 Gauge Block B4 U 12 ihCd F id F Cd 3 0 0 02 8 N N23 1 2 36 2 8 04 L 2 1 0 02 8 N 32 1 2 F V2 0 3 8 11 __d 0 BF 1 8 3 0 1 14 1 1 8 3 1 2 01 3 1 1 2 1 9 6 1 1 2 2 1 1 2 8 N 9 1 2 8 3 04 5 2 W3 0 V4 4 4 2 2 1 1 1 2 1 1 1 2 1 2 1 22 2 4 i4 1 XiY 1 22 f E 0 BFi 1 0 1 2 1 9 1 2 32...

Страница 16: ... i4 U 12 XWY F _Gih d F Cd 99 1 2 4 H2 2 9 2 12 9 9 1 1 1 2302 9 99 1 0 8 24 1 99 1 2 1 1 2 01 4 H N2 2 EUJLE 2302 1 2 32 1 994 4 1 2 99 1 2 1 1 2 2 3 9 1 2 F 4 22 Detail C 82 64 K4 1 2 99 1 2 0 1 2 32 9 1 2 8 3 0 11 0 1 2 1 99 1 2 9 6 1 1 2 F 1 2 2 0 8 24 W4 2 2 1 12 iGK 1 1 99 1 2 1 2 9 1 0 8 2 3 1 2 12 32 6 4 1x4 72 Trim Board Detail C Nail Soffit to End of 2x4 9 3 4 Soffit Soffit 9 3 4 W i d e...

Страница 17: ... 0 23 6 1 1 2 1 9 1 2 1 2 4 2 9 2 1 07 installed later7 3 2 1 1 2 9 4 5 2 1 0 1 2302 6 82 64 5 2 W3 0 V4 4 48 x 51 48 x 48 48 x 75 51 48 x 96 48 48 x 59 1 4 48 x 35 1 4 59 1 4 Step 21A Install Roof Sheathing Plyclip Cut From 48 x96 23 2 1 N 14 B4 U 12 X Y CdF_Wd 221 9 R 4 1 9 1 2 2 X Y 16 CdFK_GBh d 221 4 I 3 1 X Y 16 CdFiKGBh d 221 4 4 U 12 X Y CdF_Wd 221 9 R 4 1 1 2 2 9 1 N2 X Y 9 CdF Cd 221 4 i...

Страница 18: ... 8 24 i4 2 1 6 9 2 1 0 6 6 0 1 1 2 1 1 6 V2 1 1 9 302 V2 1 234 2 1 X Y 16 G 1 1 2 9 2 1 0 821622 2 1 1 1 2 1 67 22 3 6 0 2V 024 9 Step 21B Install Roof Sheathing continued Step 22 Install 2x4s in Front overhang B4 1 1 0 1 1 2 2 N 1 ffGihCd 0 F 821622 1 2 9 2 1 0 3 1 2 99 1 2 4 21 1 8 3 9 6 1 2302 9 99 1 2 3 9 2 1 04 5 2 W3 0 V4 99 1 3 W3 1 0 1 2 9 2 1 04 Nail with 6d Sinkers Nail with 6d Galv J 2 ...

Страница 19: ...Long 1x4 Door Trim i4 1 C d 0 BF 1 8 3 2 12 23 8 V2 3 2 04 2 8 3 8 V2 2 0 8 ih d4 5 2 W3 0 V4 4 4 1 fWGih d 0 BF 1 8 3 2 32 9 1 2 3 2 0 3 32 D 1 1 4 N 1 2 2 1 8 3 9 67 6 1 1 V2 1 2 1 6 2 6 1 1 1 23 1 2 3 4 82 Long 1x4 Door Trim Install Trim 3 4 above Opening T 1 2 2 1 3 3 1 32 3 6 4 1 GBh d F Cid 0 8 3 3 1 1 1 2 0 1 32 9 2 9 1 2 3 4 6 82 1 2 291 3 6 2 1 234 2 3 1 3 2F12 3 ih d 82 3 1 2 32 9 2 9 1 ...

Страница 20: ...8 N 9 1 2 291 3 1 2 2 1 3 2 6 2 234 6 223 1 3 2 9 1 2 3 91 1 3 1 4 f4 1 1 2 8 2 8 1 1 1 2 1 9 1 2 3 4 Barrel Bolt on the back of left door Step 25 Install Doors i T212 2 1 9 02 3 1 1 32 1 6 1 d 26 4 4 1 1 2 6 3 6 0 1 2 6 12 2 323 26 4 K4 1 3 3 2 0 1 3 4 2 1 2 3 2 1 23 1 2 32 1 6 3 3 234 B4 1 XiY 1 22 Wd 02 1 32 9 1 2 3 4 1 1 2 02 2 7 3 1 2 2 1 0 12 0 1 1 2 9 24 5 2 d 8 N 26 4 4 29 2 9 12 0 1 2 02 ...

Страница 21: ...ering Bi 83 4 9 0 2 _ 4 9 E3 E M302GBAE Install Roofing Not Supplied in Kit B4 1 21 9 230 0 0 1 2 2 3 6 3 1 2 9 1 2302 9 1 2 9 2 1 04 4 1 0 2 3 0 1 1 2 1 1 1 2 6 2 4 Roof Sheathing 1x6 Trim Metal Roof Edge 2x4 Overhang ...

Страница 22: ... d R 2 1 0 fhBWd Cd F KBd R 2 1 0 B fhBWd Cd F Cd R 2 1 0 fhBWd Cd F fKd R 2 1 0 fhBWd _Gih d F Cd R 2 1 0 fhBWd _Gih d F KBd R 2 1 0 fhBWd _Gih d F K_GBh d R 2 1 0 fhBWd iGBh d F d R 2 1 0 fhBWd fGBh d F Cd R Q2 32 I 2 B ihCd 99 1 3 _Gih dF CGih d W ihCd I 2 3 d F CGih d 8 4 BA3 N2 K 8 4 W3 Z V4 f 8 4 W3 B 84 BGBh d Q 02 K GBh d 3 26 B F g 1 Q 02 KA L 9 9 2 1 0 i BW D4 11 2 3 Z 2 B 3 Z 21 BKGih d...

Страница 23: ...plied by Local Supplier j1 4 i 4 F L 2G 1 1 3 Bf 4 F G B E a 2 L 12 4 F G CE a 2 L 12 C 4 F G BAE a 2 L 12 4 FC G CE T Q2 32 BK 4 MF12 3 0 FC B 4 R 2 1 0 FC Qty Material Shipped in 4 Extension Kit 912 F ffGihCd 3 BFi Cd 3 BFW Cd 302 N F BCGBh d L 2G8 1 J 2 8 2 G 291 3 L 2G8 1 J 2 8 2 G 0 1 3 L 23 99 1 3 ihCd F _Gih dF CGih d R 2 1 0 fhBWd F _Gih dF Cd 3 Z 21 BKGih d F fGBh d g 1 Q 02 F C 2 4 fhBWd...

Страница 24: ......

Отзывы: