All installations and services must be performed by qualified service personnel.
20
Figure 7: Proper Direct Vent Terminations (RH & LH views) and Vent
Termination Only w/o Outside Combustion Air Intake (RH view)
NOTICE:
If exterior sidewall building materials are subject to degradation
from contact with flue gases or moisture, a minimum 24-inch diameter shield
shall be fabricated from stainless steel or UV-resistant plastic sheet. The
protective shield shall be installed around the vent pipe on the outside wall.
2. Exhaust Vent Termination Elbow
The exhaust vent termination elbow shall be installed in accordance with
these instructions and any applicable local codes. Refer to Figures 7 and 8 for
typical examples of proper terminations.
a. The exhaust vent termination must be installed in the same
atmospheric pressure zone (i.e. on the same wall) as the air intake
termination.
b. The bottom edge of the vent termination elbow must be installed at
least 12-inches above the outlet of intake termination elbow.
c. The horizontal distance between the inlet and exhaust terminations
should be minimized, when possible, and should never exceed 24-
inches.
d. The vent and intake systems should utilize the same numbers of
elbows and approximately the same length of straight pipe to reach the
outside termination.
Содержание VMA1-50N
Страница 53: ...All installations and services must be performed by qualified service personnel 50 APPENDIX A REPLACEMENT PARTS...
Страница 54: ...All installations and services must be performed by qualified service personnel 51...
Страница 55: ...All installations and services must be performed by qualified service personnel 52 APPENDIX B WIRING DIAGRAM...
Страница 56: ...All installations and services must be performed by qualified service personnel 53...