Reval RUBIS 3017.00 Скачать руководство пользователя страница 3

EQUIPMENT OVERVIEW 

 

 

 
 
 
 
 
 
 
 
 

CONTROL PANEL 

 

 

 

 

 

2/12 

9    Disinfectant tank access panel 

10  Wheel with brake 

11  Flow intensity adjustment valve 

12  Cleaning shower 

13  Fresh water tank drainage 

14  Waste water tank drainage 

15  Mattress water drainage hose 

16  230V electric feeding cable

 

1   Control panel 

2   Waste water tank 

3   Fresh water tank 

4   Single handle bar faucet (option 3017.60) 

5   Washbasin (option 3017.60) 

6   Stainless steel bowl (option 3017.60) 

7   Stainless steel handrail 

8   Maintenance access panel

 

Содержание RUBIS 3017.00

Страница 1: ...A4AN3017 doc 23 08 2016 EN Instruction manual SHOWER IN BED SYSTEM RUBIS 3017 00 3017 00 UK...

Страница 2: ...TANK 6 ELECTRICS 6 ADJUSTING WATER TEMPERATURE 6 HEATING WATER 7 FITTING SHOWER SHEET 7 SHOWERING 7 DRAINING MATTRESS 7 DRAINING TANKS 7 MAINTENANCE CLEANING 8 DESCALING 8 THERMAL DISINFECTION AGAINST...

Страница 3: ...ower 13 Fresh water tank drainage 14 Waste water tank drainage 15 Mattress water drainage hose 16 230V electric feeding cable 1 Control panel 2 Waste water tank 3 Fresh water tank 4 Single handle bar...

Страница 4: ...tank in stainless steel capacity 23L 24V shower pump 8 litres min 24V drainage pump 14 litres min Simultaneous pump function Temperature controller with double display real temperature and set temper...

Страница 5: ...e The max temperature cannot exceed the factory setting of 41 A red warning light illuminates if the fresh water tank temperature is 2 higher than the set temperature The on off button starts and stop...

Страница 6: ...nage valve is closed before filling the fresh water tank Always check that the waste water tank drainage valve is closed before draining the water sheet When using disinfectant wear rubber gloves and...

Страница 7: ...the tank ELECTRICAL CONNECTION Connect the electric power cable to a 230V electric socket 16A min required which must be 1m minimum from the individual s bed WARNING If the red warning light illumina...

Страница 8: ...the water temperature before applying the showerhead to the individual Take the handheld shower Check that the flow intensity valve is opened Switch on the the shower pump by turning the button Adjust...

Страница 9: ...proceed as follows Arm yourselves with protective gloves mask and safety glasses Remove the metallic grid from the fresh water tank Spray the scaling product Actigel r f 1438056 on the walls of the t...

Страница 10: ...MAINTENANCE CLEANING DISINFECTION PROCEDURE BETWEEN 2 SHOWERS average time 5 min 9 12...

Страница 11: ...MAINTENANCE CLEANING DISINFECTION PROCEDURE AT THE END OF USE average time 20 min 10 12...

Страница 12: ...e noted in the logbook which should be retained by the individual responsible for the servicing maintenance of the trolley 4 The date of corrective actions should also be noted in the logbook 5 If the...

Страница 13: ...MAINTENANCE LOGBOOK Agent name and signature Corrections Observations Operation Safety parts Control date 12 12...

Страница 14: ...ulle Tel 33 05 46 42 04 16 Fax 33 05 46 43 06 38 www groupe reval com UNITED KINGDOM Reval Continuing Care Limited Unit 17 Brynmenyn Busines Centre St Theodore s Way Brynmenyn CF32 9TZ BRIDGEND WALES...

Отзывы: