
Step 6:
Lay the Twin Slat Roll (10) in between the Front Side Rail
(4) and Back Side Rail (3), then tighten with Big Screws (F).
-
-The webbing on the slats should be on the bottom side.
-Numbers on the slat roll show the locations to tighten the Big Screws
Page 8 of 11
( )
( )
1
2
3
4
5
7
6
8
10
10
F
F