background image

3RCG-inst2-V3

1-866-876-8044   •   416-615-0214   •   www.respicaire.com

Installation

A

B

.  T

urn OFF power

 

to the

 f

urnace

 

or

 a

ir

 

h

a

ndler

C

 

or

 a

ir

 

h

a

ndler

T

he  CG 95 1

" E

lectronic

 

Air

 

Cle

a

ner

 

requires 

Step 1

24V

AC to oper

a

te

. T

his power

 

is best

 

supplied with

 

a separate, dedicated 24VAC transformer.

Dedicated Transformer

20/40VA Transformer

   

CAUTION

!

 

Be sure to connect to a certified, thermically protected,
Class II power transformer with 24Vac, 60Hz, 5VA min.

 

 

 

 

   

WARNING!

 

  

 

 

   

to

 

heed them

 

c

a

n result

 

in serious in

j

ury

 

or

 

de

a

th

.

   

CAUTION!

 

 

 

 

F

a

ilure

 

to heed them

 

c

a

n result

 

in in

j

ury

 

or

 

m

a

teri

a

l

 

property

 

dam

a

ge

   

WARNING

!

 

  

 

E

lectric

a

l wiring

 

should only

 

be

 

per

f

ormed by

 a 

qualified technician.

 

   

Installation

Step 2

2a)

2b)

For the separate 24VAC transformer there are two op�ons. 

A second op�on is to connect the 120 to 24VAC transformer

 

to a 120 line voltage terminal on the circuit board. This will

 

typically be a constant on connec�on.

If the circuit board has an “EAC” (Electronic air cleaner)

 

terminal you can connect there. This circuit is connected

 

to the fan & will ac�vate the air cleaner when the fan circuit

 

is on. The EAC terminal is usually 120 volt however do

 

confirm this with a volt meter or the circuit board electrical

 

specifica�ons. 

Running the Power Cord 

It may be necessary to run the power cord through the

 

cabinet of the furnace or air handler to reach the filter 

rack area. If so:

Drill a suitably sized access hole in the cabinet to run

 

the power cord through...or...run the cord through 

one of the rubber plugs on the side of the furnace

 

or air handler.
Insert the supplied grommet if an access hole(9/32”)

 

was drilled. This will protect the insula�on of the power

cord from being cut or damaged.
Do not crimp or abrade the cord.

a.

b.

c.

d.

equipment, including the blower of the furnace or air 

Ensure the power cord is kept away from any rota�ng

handler

.

Step 3)

Rubber Access Plug

9/32” 

Hole

OR

Содержание MicroClean 95

Страница 1: ...ght Epoxy Sealed Electronics Convenient Easy Maintenance Power supply can cause electrical shock Be sure the power supply is disconnected before installa on begins THE RESPICAIRE ELECTRONIC AIR CLEANER REQUIRES CONNECTION TO A 24 VOLT POWER SOURCE DO NOT CONNECT THE POWER SUPPLY CORD TO 120 VOLT Do not open the power head on top of the unit It is epoxy sealed there are no service components inside...

Страница 2: ... on the circuit board This will typically be a constant on connec on If the circuit board has an EAC Electronic air cleaner terminal you can connect there This circuit is connected to the fan will ac vate the air cleaner when the fan circuit is on The EAC terminal is usually 120 volt however do confirm this with a volt meter or the circuit board electrical specifica ons Running the Power Cord It may...

Страница 3: ...als to be sure the CG95 is supplied with power Turn the thermostat to the ON posi on The CG 95 Electronic Air Cleaner has been designed to operate either with constant power or in series with the system s fan Both methods will permit reliable long term performance For the best performance of the CG 95 the furnace or air handler blower should be set to run con nuosly The CG 95 may arc or snap elect...

Страница 4: ..._______________________________________________________________________________ Physician s Authorization _______________________________________________________________________________________________ Prescription ___________________________________________________________________________________________________________ Patient Name ________________________________________________________________...

Отзывы: