RJ-45 Connections
SFP Transceiver
EQUIPMENT
CHECKLIST
After unpacking this switch, please check the contents to be sure
you have received all the components. Then, before beginning
the installation, be sure you have all other necessary installation
equipment.
PACKAGE
CONTENTS
GEL2P-ESW10G 10 Port Series GbE Management
Switch
Four adhesive rubber feet
Mounting Accessory (for 19” Rack Shelf, Optional)
This Installation Guide
User’s Manual CD
AC Power Cord
RJ-45 Console Cable
N
OTE
:
Please notify your sales representative immediately if
any of the aforementioned items is missing or damaged.
W
ARNING
:
The mini-GBICs are Class 1 laser devices. Avoid direct
eye exposure to the beam coming from the transmit port.
MOUNTING
The switch can be mounted in a standard 19-inch equipment
rack or on a desktop or shelf. Mounting instructions for each
type of site as follow.
RACK MOUNTING
Before rack mounting the switch, please pay attention to the
following factors:
Temperature: Since the temperature within a rack assembly
may be higher than the ambient room temperature, check
that the rack-environment temperature is within the
specified operating temperature range (0 to 45 °C).
Mechanical Loading: Do not place any equipment on top of a
rack-mounted unit.
Revision A1
8