![Repotec 16-P SFP Скачать руководство пользователя страница 21](http://html1.mh-extra.com/html/repotec/16-p-sfp/16-p-sfp_user-manual_1443532021.webp)
User Manual
Publication date: January, 2006
Revision A2
13
2-1-3-3. Switch Cascading in Topology
•
Takes the Delay Time into Account
Theoretically, the switch partitions the collision domain for each port in switch
cascading that you may up-link the switches unlimitedly. In practice, the network
extension (cascading levels & overall diameter) must follow the constraint of the
IEEE 802.3/802.3u/802.3z and other 802.1 series protocol specifications, in which
the limitations are the timing requirement from physical signals defined by 802.3
series specification of Media Access Control (MAC) and PHY, and timer from some
OSI layer 2 protocols such as 802.1d, 802.1q, LACP and so on.
The fiber, TP cables and devices’ bit-time delay (round trip) are as follows:
1000Base-X TP, Fiber
100Base-TX TP
100Base-FX Fiber
Round trip Delay: 4096
Round trip Delay: 512
Cat. 5 TP Wire:
11.12/m
Cat. 5 TP Wire:
1.12/m
Fiber Cable:
1.0/m
Fiber Cable :
10.10/m
TP to fiber Converter: 56
Bit Time unit : 1ns (1sec./1000 Mega bit) Bit Time unit: 0.01
µ
s (1sec./100 Mega bit)
Table 2-2
Sum up all elements’ bit-time delay and the overall bit-time delay of
wires/devices must be within Round Trip Delay (bit times) in a half-duplex network
segment (collision domain). For full-duplex operation, this will not be applied. You
may use the TP-Fiber module to extend the TP node distance over fiber optic and
provide the long haul connection.
•
Typical Network Topology in Deployment
A hierarchical network with minimum levels of switch may reduce the timing
delay between server and client station. Basically, with this approach, it will
minimize the number of switches in any one path; will lower the possibility of
network loop and will improve network efficiency. If more than two switches are
connected in the same network, select one switch as Level 1 switch and connect all
other switches to it at Level 2. Server/Host is recommended to connect to the Level
1 switch. This is general if no VLAN or other special requirements are applied.
Содержание 16-P SFP
Страница 1: ...8 P TP 16 P SFP L2 Managed Gigabit Switch User s Manual Release 2 14 ...
Страница 3: ...iii TU3 2 2 Port ConfigurationUT 51T U ...
Страница 5: ...v UAPPENDIX B NULL MODEM CABLE SPECIFICATIONSU 245 ...
Страница 8: ......
Страница 26: ...User Manual Publication date January 2006 Revision A2 18 Username admin Password admin ...
Страница 100: ...User Manual Publication date January 2006 Revision A2 92 Fig 3 40 ...
Страница 116: ...User Manual Publication date January 2006 Revision A2 108 Default Auto ...
Страница 124: ...User Manual Publication date January 2006 Revision A2 116 ...
Страница 142: ...User Manual Publication date January 2006 Revision A2 134 Fig 3 66 ...
Страница 155: ...User Manual Publication date January 2006 Revision A2 147 Fig 4 1 Fig 4 2 ...
Страница 188: ...User Manual Publication date January 2006 Revision A2 180 192 168 1 115 is alive ...
Страница 220: ...User Manual Publication date January 2006 Revision A2 212 ...
Страница 224: ...User Manual Publication date January 2006 Revision A2 216 ...
Страница 239: ...User Manual Publication date January 2006 Revision A2 231 ...
Страница 254: ......
Страница 255: ......