background image

Upsite

A

ss

em

bl

y a

nd

 o

pe

ra

tin

g i

ns

tr

uc

tio

ns

Содержание Upsite U05

Страница 1: ...Upsite Ass emb ly and oper atin g instr ucti ons ...

Страница 2: ...perating instruction before initial operation of the height adjustable workplace Further please keep this instruction together with the product Wilhelm Renz GmbH Co KG Assembly and operating Instruction for height adjustable desks model U05 Frame type 1300 TP Format 05 1800 x 1000mm Product version 1300 05b dated March 03 2021 U07 Frame type 1300 TP Format 07 2000 x 1000mm Product version 1300 07b...

Страница 3: ...ng desk on toolboard cable pipe B 12 8 Information on power cable A B 15 9 Assembly of cable channel A B 16 10 Assembly single unit container 17 11 Assembly and configuration of drawers 18 11 Initial operation 19 1 Procedure for initial operation 19 2 Connect drive units 19 3 Connect hand control 19 4 Connect power cable 19 12 Initialization reset 20 13 Operation 20 1 Normal operation 20 2 Save co...

Страница 4: ...ion Non observance of these instructions may have health effects result in life threatening injuries and may result in death and damage to property 4 Safety instructions These operating instructions contain safety instructions which draw your attention to possible dangers and thus enable safe operation of the sit stand table Please observe these safety instructions It is essential that you read an...

Страница 5: ... table top Danger of unintentional operation and sudden height adjustment danger of crushing There is a danger of crushing when changing the table top position Therefore make sure that there are no objects or persons in the danger area and that you do not reach into the danger area Make sure that movable furniture does not get into the lifting area e g window sashes above the table danger of block...

Страница 6: ...cases in the section Error Messages To avoid malfunctioning all repairs must only be made by authorized service personnel To repair the sit stand table only original spare parts are allowed The sit stand table must not be handled or used improperly and no alterations may be made to the table frame or electrification otherwise Renz s warranty and declaration of CE conformity will lapse 9 Maintenanc...

Страница 7: ... make sure that the product is acclimated to the values for temperature and humidity for operation 1 Overview freestanding desk A Free standing desk A Lifting column with foot stabilizers 2 x 1 Frame 1 x 2 Pressure plates 2 x 3 Control with carrier plate 1 x 4 Cable chain A with cable ducts Set 1 x 5 A Cable channel Set 1 x 6 Bags of screws 1 x 7 Assembly tools 1 x 8 4 x Pressure bush black 4 x M6...

Страница 8: ...e 1 x 2 Pressure plates 2 x 3 Control with carrier plate 1 x 4 Cable conduit B with cable ducts Set 1 x 5 B Cable channel Set 1 x 6 Bags of screws 1x 7 Assembly tools 1 x 8 Container with lifting column 1 x 9 Left right 4 x Pressure bush black 4 x M6 x 50 4 x M6 x 16 black 2 x M4 x 30 with spacer sleeve 6 2 4 3 1 9 5 ...

Страница 9: ...chment points Hand tighten the frame and lifting column with 4 M6 x 50 half round head screws and 4 pressure bushes All parts must fit together tightly gap free Screw one pressure plate 3 each under the motor housing Use 4 pieces each M6 x 16mm screws black zinc plated The curved pressure plate 3 pushes the motor housing into the plate frame when correctly mounted the perforated edge points upward...

Страница 10: ...dditional cable ties Cables must not project beyond the upper edge of the frame Do not run the cables over each other in the area above the control unit Cables must not be pinched squeezed or nodded Use only the supplied 3 pole power supply cable or mains cable If the power cord of this unit is damaged it must be replaced by the manufacturer or its customer service or a similarly qualified person ...

Страница 11: ... desired table leg Important Accurately centered on the table leg lower edge approx 6cm above the floor Screw the chain holder with 4 round head screws M4x6 upwards against the pressure plate 3 Guide the cable upwards through the frame between table leg and the control The cabling can only be mounted on the inside When putting the desk into operation it is important to move the desk fully upwards ...

Страница 12: ...he adjustable gliders so that the lifting columns are aligned in all directions verti cal and horizontal Only parallel columns ensure the proper function Mount the frame parts with the screws Only qualified personnel may change the wiring 2 Install the cable conduit correctly Dismantle the cover bottom on container U76 screwed from below The strain reliefs of the mains cable orange arrows must not...

Страница 13: ... is mounted exactly and parallel to the lifting column If necessary you must align the adapter with the oblong holes ATTENTION IMPORTANT Make sure that the cable harness in the cable duct has the correct length In any height position the cables must hang loosely in the cable duct Never clamp any cables between moving parts Carry out a visual inspection of the wiring To do this move the desk fully ...

Страница 14: ...he components so that the guide tube is positioned upright in the cable duct The cable conduit must be aligned parallel inside the cable duct especially in the retracted position Blue arrows Upsite Assembly 14 ...

Страница 15: ...dangers Cable protection 7 3 Cable protection 7 2 Strain relief 7 1 The table must not be operated without the cable protection 7 2 7 3 and the strain relief 7 1 Cables should be sorted straight and never twisted as a closed wire harness Attention During the reset run the column and cable conduit additionally 25mm move downwards from the lower position TH 740 The lower cable loop must be checked w...

Страница 16: ... locks must lock almost automatically To open the channel slide the side wall horizontal red arrow inwards To close gently push the channel upwards vertical green arrow Attention Opening and closing are done without effort Insert the end covers left and right into the channel profile Always remove the covers before opening the cable channel Magnets inwards Upsite Assembly 16 ...

Страница 17: ... can be led into the container through the lower ventilation gap The back panel can be opened to simpify electrification After closing the back panel must be locked again Store cables neatly organized in the room behind the drawer Use a cable holder Never pinch or squeeze the cables To install the power strip fasten the provided bracket to the pre drilled position on the inside of the back panel U...

Страница 18: ...r the ribling Thighten screw 1 5 mm Release the clam ping lever push until drawer locks in place Pull out drawer completely and lift On the underside of the drawer you will find the following adjustment options on the left and right Green screw Move drawer forward or backward in the cabinet Green lever Adjusting the spring force of the Tipmatic function Höhenverstellung Seitenverstellung der Front...

Страница 19: ...ceed as follows to install the sit stand desk 3 Connect drive units Ensure that the connection cables of the drive units extend from both sides to the corresponding connection of the controller Off center installation of the controller may be required Establish the connection between the drives and the controller using the motor cables The plug connections on the 8 pole motor sockets must engage f...

Страница 20: ...pressed until the desired position is reached Do not place any objects on the hand controls integrated into the desk top Danger of unintentional operation and sudden height adjustment danger of crushing 2 Save container shelf stop position To save a container shelf stop position proceed as follows Move the sit stand table to the position you want to use as the new container shelf stop position Now...

Страница 21: ...ion level to be found on the type plate with every customer service request In case the system is out of order the SMART neo pro must be replaced 1 Possible problems and their solutions Note Manual reset may be required if a power failure occurs or the power cord is unplugged while the table is in motion Upsite Troubleshooting 21 ...

Страница 22: ... Technical data Nominal current consumption 2A Nominal frequency 50 Hz Nominal voltage 220 240 V Nominal capacity 240 W Standby 0 3 W Duty cycle 2 min ON 120 W 18 min OFF or 0 5 min ON 240 W 0 5 min ON 120 W 9 min OFF Dimensions L W H 218 2 84 5 36 5 mm Weight 317 g Environmental conditions 5 C to 40 C at max 68 relative humidity non condensing during operation up to an altitude of 2 000 meters Up...

Страница 23: ...these assembly instructions This applies to all work on the desk Stop the sitting standing desk and relieve the desk of weight Switch off the power supply and unplug the power cord 18 Safety instructions magnets The cable channel on the single table is fixed with strong permanent magnets Keep data carriers memory cards credit and debit cards or watches away to avoid damage For cardiac pacemakers f...

Страница 24: ...24 Upsite Tests and certificates 20 Tests and certificates ...

Страница 25: ...25 Upsite Tests and certificates ...

Страница 26: ...26 Upsite Tests and certificates ...

Страница 27: ... Type 1300 Table top 05 Format 1800 x 1000mm Version 1300 05b vom 22 03 2021 Typ U07 Frame type 1300 Table top 07 format 2000 x 1000mm Version 1300 07b vom 22 03 2021 Typ U09 Frame type 1500 Table top 09 format 2200 x 1000mm Version 1500 09b vom 22 03 2021 Typ U11 Frame type 1500 Table top 11 format 2400 x 1000mm Version 1500 11b vom 22 03 2021 Description Electrically height adjustable office des...

Страница 28: ...12 2021 Wilhelm Renz GmbH Co KG Hanns Klemm Straße 35 71034 Böblingen Germany T 49 0 7031 21880 F 49 0 7031 218850 info renz de www renz de ...

Отзывы: