22
Pneumatic set-up
(continued)
Operation sequence (circuit 4)
Operation
sequence
Stylus
Solenoid
valve
End of sequence trigger Monitor Variable to
set
1 Cover extend
Protected
0
Pressure switch activation Pressure
switch
Time
2 Cover retract
Accessible
1
Retract sensor
Retract
sensor
1 Cover extend
Protected
0
Pressure switch activation Pressure
switch
Time
Bulkhead
V1
APCS with no “air bleed” (circuit 4)
Содержание APCA 45
Страница 4: ...This page is intentionally left blank...
Страница 14: ...APC HSI HSI C 76 dB A x Before you begin continued...
Страница 23: ...9 Preparing the machine for APC installation continued Acceptable orientation of the APC Recommended...
Страница 32: ...18 Pneumatic set up continued APCA with air bleed circuit 2 Bulkhead V3 V2 V1...
Страница 34: ...20 Bulkhead V2 V1 APCS with air bleed circuit 3 Pneumatic set up continued...
Страница 50: ......
Страница 51: ......