background image

1.800.627.4499

2

TC7D Series Digital Time Clock

ACCESSORY

 

WARNING

TO REDUCE THE RISK OF FIRE, ELECTRIC SHOCK, OR INJURY TO 
PERSONS, OBSERVE THE FOLLOWING RULES:  
Use the unit only in the manner intended by the manufacturer.

 

If 

you have questions, contact the manufacturer.

Before installing, servicing or troubleshooting the transformer/re-
lay package, switch power off at service panel and lock service 
panel to prevent power from being switched on accidentally.  

More than one disconnect switch may be required to de-energize 
the equipment for servicing.

 

Installation work and electrical wiring must be done by qualified 
person(s) in accordance with all applicable codes and standards, 
including fire-rated construction codes and standards.

 

When cutting or drilling into wall or ceiling, do not damage elec-
trical wiring and other hidden utilities.

 

NEVER place a switch where it can be reached from a tub or 
shower.

Intended for use with 24 VAC Class 2 power supplies only.

Do not connect loads that exceed the timer’s switch rating.

Confirm sufficient 24 VAC power is available to operate the timer 
and the connected loads.

 

CAUTION

Содержание TC7D Series

Страница 1: ...TC7D W Wall mount TC7D E Enclosure TC7D W Wall Mount TC7D E Enclosure TC7D SERIES DIGITAL TIME CLOCK Supplemental Installation Manual for Accessories ...

Страница 2: ...re than one disconnect switch may be required to de energize the equipment for servicing Installation work and electrical wiring must be done by qualified person s in accordance with all applicable codes and standards including fire rated construction codes and standards When cutting or drilling into wall or ceiling do not damage elec trical wiring and other hidden utilities NEVER place a switch w...

Страница 3: ... 2 1 TC7D E Dimensions 5 Figure 2 1 0 Setting Instructions 5 TABLE OF SCHEMATICS Figure 3 1 0 EV90 EV90P EV130 EV200 and EV300 Schematic 6 Figure 3 1 1 SL70 Schematic 6 Figure 3 1 2 EV450 HE1XIN and HE1 5IN Standard Wiring Schematic 6 Figure 3 1 3 EV450 ECM Schematic 7 Figure 3 1 4 HE1X and HE1 5 ECM Schematic 7 Figure 3 1 5 HE1XRT HE1 5RT with Independent Blower Control and HE2X through LE10X Sch...

Страница 4: ...les can be programmed u Each on off cycle can be assigned to any one day of the week or to the following groups of days Monday Friday Monday Saturday Monday Sunday Saturday and Sunday u Manual Over ride provided by On Auto Off switch u Program Reset button clears all settings Enclosure TC7D W Requires a 4 x 4 electrical box by others u Box must accommodate 4 mounting screws see drawing u Minimum b...

Страница 5: ...te switch cycle number changes to 2 and bulb blanks indicating switch off circuit opens Press 1 7 button to match day s set for switch cycle 1 Press h and m buttons to select switch off time Autorun Slide Set switch to Run and Mode switch to Auto switching begins with next switch on set time Override On Slide Mode switch to I Switch remains on indefinitely circuit closed Override Off Slide Mode sw...

Страница 6: ...2 1 EV Residential 1 2 3 4 5 TC7D W TC7D E 5 4 3 2 1 1 2 3 BLACK RED YEL BLUE RED YELLOW The Normally Closed N C contacts of one or more additional Low Voltage Controls may be connected to ERV unit in parallel with the TC7D E W Unit s 24VAC Power Supply ERV INTERNAL CONTROL C Isolation Relay Coil WIRING SIMPLIFIED BLUE YEL YEL RED EV450 1X 1 5IN FIGURE 3 1 2 EV450 HE1XIN AND HE1 5IN STANDARD WIRIN...

Страница 7: ...int temperature by 8 degrees F RH NOTE Remove supplied wires from the time clock spade terminals prior to wiring to a RH W thermostat as shown FIGURE 3 1 6 RH W ELECTRIC HEATER SCHEMATIC NOTE For HE1XRT and HE2X through LE10X models built prior to 1 22 2011 please call RenewAire Customer Service at 800 627 4499 or email RenewAireSupport RenewAire com 1 2 3 4 5 TC7D W TC7D E 5 4 3 2 1 1 2 3 Unit s ...

Страница 8: ...ability derived from innovative design practices expert workmanship and Quick Response Manufacturing QRM As the pioneer of static plate core technology in North America RenewAire is the largest ERV producer in the USA We re committed to sustainable manufacturing and lessening our environmental footprint and to that end our Waunakee WI plant is 100 powered by wind turbines The facility is also one ...

Отзывы: