Inside Ductwork System

Follow Engineer’s Ductwork Design

Ductwork should be designed by an engineer to allow the unit to 

provide the required airflow.

Design Tips

Air Flow Rates

Design the system to provide the lowest air exchange rate that will 

accomplish the ventilation goals. At lower air flow rates, energy 

recovery effectiveness improves. See Product Data Sheet.

Duct Transitions

Ducts should enter and exit the unit through smooth, gradual 

transitions.

Duct Insulation:

If the inside ducts run through un-conditioned spaces, they must 

be insulated, with a sealed vapor barrier on both inside and 

outside of insulation.

Picking up Stale Air in the Building

Locate the stale air pick-ups high in rooms where moisture, odor, 

or other contaminants are generated. 

If some duct runs are much shorter than the others, install dampers so 

you can balance flows. Most rooms require only one stale air pick-up.

Duct Fresh Air from the HE3XIN into the heated space

Fresh Air from the HE3XINH often can be ducted into an existing HVAC 

air distribution system.

Sometimes, however, it is more practical to install a separate 

distribution system for the Fresh Air.

The Fresh Air supplied by the HE3XINH will be somewhat cooler or 

warmer than room air in very cold or hot weather. Consider this when 

deciding how to distribute the Fresh Air.

Connection of Fresh Air from HE3XINH to ducted heating & cooling 

system:

Avoid a situation in which operation of the main air-handling blower 

unbalances  flow  through  the  HE3XINH.  (See  Balance  the Air  Flows, 

below). This is a particular concern if the HE3XINH is to be operated 

on a different schedule from the main air-handler. Minimize the effect 

of the air-handler on the HE3XINH by connecting Fresh Air from unit at 

a point well upstream from the air handler.

Balance the Air Flows

The air flow rate for both the Fresh Air and the Exhaust Air should be 

roughly equal (or “balanced”) for best performance of the HE3XINH. If 

the HE3XINH is connected to an existing air-handling system it may be 

necessary to check for balance with and without the main air-handling 

blower in operation.

In some facilities a slight positive or negative pressure in the building 

is desired. RenewAire heat recovery ventilators can generally operate 

with a flow imbalance of up to 20% without appreciable loss in heat 

recovery  efficiency.  However,  very  low  exhaust  air  flow  rates  may 

result in frosting of the core during extremely cold weather.

DO NOT PLACE ANY PICK-UPS IN GARAGES, LOADING 

AREAS OR IN FUME HOODS! 

Make the Ducts from the Stale Air Pick-ups to the 

HE3XINH as simple and direct as possible.

Sound Attenuation

General Practices

Take these simple steps to attenuate noise from the unit.

Outside the building:

Exhaust velocity noise is the primary cause of unit-related noise 

outside the building. Size the exhaust duct and grille for less 

than 1000 fpm air velocity. When practical, orient the exhaust air 

hood to point away from houses or public areas.

Ducts:

Make sure the ductwork at the unit outlets is stiff enough to 

resist the flexure and resulting booming associated with system 

start-up and shut-off, as well as the turbulent flow conditions at 

the blower outlets.

In general, provide smooth transitions from the ERV’s outlets to 

the duct. The ducts connecting to the outlets should be straight 

for a sufficient distance, with gradual transitions to the final duct 

size.

These guidelines are consistent with SMACNA recommended duct 

layout  practices  for  efficient  and  quiet  air  movement.  Follow 

SMACNA guidelines.

Radiated Noise

The  HE3XINH  is  insulated  with  high-density  fiberglass.  This 

provides significant attenuation of radiated sound.

The  outlet  ducts  can  be  significant  sources  of  radiated  sound 

as well. The FA and EA ducts (outlet ducts) should be insulated 

for sound control. This insulation should start at the unit. At a 

minimum the first ten feet of duct should be insulated. All parts 

of the FA and EA ducts located in the mechanical space should 

be insulated for sound control, both to minimize sound radiation 

out of these ducts and also to control sound radiation into the 

ducts.

Aerodynamic (Velocity) Noise

When sound attenuation is a design concern, the primary 

consideration is velocity noise at the unit’s Fresh Air blower 

outlet. The average velocity at the blower outlets is 3300 FPM 

when the unit is operating at 3300 CFM.  

Содержание HE3XINH

Страница 1: ...xhausting of gases through the flue chimney of fuel burning equipment that might be installed in the area affected by this equipment If this unit is exhausting air from a space in which chimney vented...

Страница 2: ...hange core The fresh air inlet should be at least 10 away from chimneys furnace and water heater exhausts and other sources of carbon monoxide humidity or other contamination Do not locate the fresh a...

Страница 3: ...g air handling system it may be necessary to check for balance with and without the main air handling blower in operation In some facilities a slight positive or negative pressure in the building is d...

Страница 4: ...OR OUTDOOR IN INDOOR 1 5 MODEL HE 3X 20 16 17 UNUSED IN HE 3X MODELS 24 L LISTED N NON LISTED OPTION 4 OTHERS T TR TRANSFORMER WITH ISOLATION RELAY NONE W WHITE PAINT C CUSTOM PAINT X CUSTOM UNIT 1 2...

Страница 5: ...needed HE3XINH Airflow Performance Motor HP Blower RPM Turns Open External Static Pressure in w g 0 00 0 25 0 50 0 75 1 00 1 25 1 50 SCFM BHP SCFM BHP SCFM BHP SCFM BHP SCFM BHP SCFM BHP SCFM BHP 2 1...

Страница 6: ...cap from pressure port before inserting tubing Insure tubing is well seated in pressure ports NOTE The tubing should extend in the pressure port approx 1 inch Cross Core Static Pressure Measurement I...

Страница 7: ...INSTALL PROVIDED JUMPER BETWEEN TERMINALS 2 3 UNIT CONTROL USING CLASS II 24VAC POWER FROM ANOTHER POWER SOURCE 24VAC POWER AVAILABLE AT TERMINALS 1 2 DO NOT INSTALL JUMPER BETWEEN TERMINALS 2 3 HE3X...

Страница 8: ...the control terminals of this unit 5 Unit is not equipped to receive analog signals such as 1 10vdc or 4 20mA 6 Unit is not equipped to communicate directly with Building Management Systems such as B...

Страница 9: ...onnect Terminals 2 3 Connect Switch between Terminals 1 4 UNIT INTERNAL CONTROL WIRING SIMPLIFIED A SWITCH OR NON POWERED CONTROL USING UNIT S 24VAC POWER SUPPLY UNIT INTERNAL CONTROL WIRING SIMPLIFIE...

Страница 10: ...HE3XINHMan_Jan12 indd Revised 01 2012 www renewaire com Page 10 HE3XINH Replacement Parts A CORES B FILTERS C BLOWER DOOR D TURN LATCH E DISCONNECT SWITCH F TRANSFORMER G ISOLATION RELAY H OVERLOAD RE...

Страница 11: ...o continuing product development specifications are subject to change without notice 2012 RenewAire LLC 134785_005 HE3XINHMan_Jan12 indd Revised 01 2012 www renewaire com Page 11 THIS PAGE INTENTIONAL...

Страница 12: ...Blowers every time you change the filters Confirm bearings are still secure to blower shaft It should not be possible to move the blower shaft back and forth along its length Confirm blower wheel is n...

Отзывы: