UM-B-041
SmartBond Production Line Tool
User Manual
Revision 4.8
02-Nov-2022
CFR0012
94 of 170
© 2022 Renesas Electronics
Figure 78: GUI PLT Testing (2 of 2)
After the testing procedure is completed (
), the progress bar shows
FINISHED
and the
color turns red if any DUT has failed, otherwise it is green. If there is an error and the
Retest failed
DUTs
and
Ask to retry
options are enabled, a message will appear asking if the user would like to
retest the failed DUTs, as shown in
. When the GUI PLT performs a retest run, all options
(including the BD addresses) remain the same and only tests that failed are retested. At this time, the
CSV File (Section
and all the
DUT Log Files (Section
) are updated.
Figure 79: GUI PLT Tests Finished