7.3.1
GUI PLT Settings
Figure 74: GUI PLT Settings
GUI PLT settings
window. In this window, various graphic options and features
can be set as described in
Table 61: GUI PLT Settings
Field
Option
Description
Hide results
BD address
This option will hide the
BD
address
column in the DUT panel of the GUI PLT.
Code
This option will hide the
Code
column in the DUT panel of the GUI PLT.
Status
This option will hide the
Status
column in the DUT panel of the GUI PLT.
GU
This option will hide the
GU
column in the DUT panel of the GUI PLT.
Hide
instruments
BLE Tester
This option will hide the
BLE Tester
column in the GU panel of the GUI PLT.
Temp
This option will hide the
Temp
column in the GU panel of the GUI PLT.
Ammeter
This option will hide the
Ammeter
column in the GU panel of the GUI PLT.
Retest failed
DUTs
Enable
If this option is enabled, any DUT that failed during the main procedure will
immediately re-run the tests having the exact same options including the
BD
address
assigned to it. This option is the exact same option as
Re-test failed
DUTs
in Section
Ask to retry
This option will show a message asking to do a re-test in case any DUT failed.
If this option is disabled, the re-testing will be done automatically.
Multiple
Runs
Enable
By enabling this option, the GUI PLT will perform multiple procedures without
any delay between them. This is used for only for evaluation.
Times
The number of times to run.