UM-B-041
SmartBond Production Line Tool
User Manual
Revision 4.8
02-Nov-2022
CFR0012
21 of 170
© 2022 Renesas Electronics
Figure 10: GU Reset Circuit
5.7
Current Measurements
The PLT board provides connections to perform DUT current measurements (
). By
connecting a current meter to the blue banana sockets, the combined VBAT current of all DUTs can
be measured. Jumper J26 should be removed when a current meter is connected. If no current meter
is used, jumper J26 should be mounted. See also Section
The connection shown in
can only be used with the VBAT Only (Section 6.9.1) and VBAT
On with Reset (Section
)(when the VBAT lines are used to power the DUTs) modes. If the DUTs
are powered using a single external power supply, then the multi-meter should be connected on that
power supply in a similar way as described before with the PLT. If the DUTs are powered
independently (e.g., each one with its own battery) the current measurement procedure cannot be
used.
Figure 11: VBAT DUT Current Measurement Setup
5.8
Jumper Settings
This section describes the PLT hardware jumper settings.
CU
RR
E
NT
CU
RR
E
NT