F.3
Procedure
describes the steps to follow to calculate the RF path losses for each different DUT
position.
Table 67: Procedure Steps
#
Step
Description
1
Open the
SmartBond_PLT_CF
G.exe
PLT
configuration
executable.
User should configure the PLT so only XTAL trim (without OTP burn) and one Golden
Unit RF test is enabled.
2
Enable all 16 DUTs
Select the GU COM port and Enumerate the DUT COM port numbers.
3
Enable only the
Production tests
Under the General tab, enable only the Production tests and disable the Memory
programming.
4
Enable XTAL trim
(no OTP burn) and
one Golden Unit
RF test at middle
band at 2440 MHz.
RSSI and PER limits do not matter. These should be set to a small value (less than -
70 dBm) as shown below. Ideally, we want the limits to be set to a value that all RF
tests PASS.