background image

NOTLAR

 

 
 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Содержание R112CE

Страница 1: ...7013 16 PIN 2422CS701316 Model R112CE R113CE retici REMTA MAK NA TH HR SAN T C LTD T retim Adresi Ak aburgaz Mah 4 Cad 153 Sok No 23 34522 Esenyurt stanbul 90 212 886 27 11 info remta com tr www remt...

Страница 2: ...f possible malfunctions do not allow any intervention to the device other than our technical service and competent persons Before installing and using the device please read the user manual carefully...

Страница 3: ...E R113CE POWER 6 kW 12 kW TOTAL EXPENDITURE G20 0 63 m3 h 1 26 m3 h TOTAL EXPENDITURE G30 0 47 kg h 0 94 kg h AIR 17 m3 h 34 m3 h TYPE A1 A1 GAZ G R inch 1 2 1 2 NATURAL GAS G20 LPG GAS G30 TECHNICAL...

Страница 4: ...m Gaz G c QN 6 kW Toplam Harcama V G20 0 63 m h LP G Toplam Harcama V G30 0 47 kg h D GAZ Havaland rma 17 m h al ma Bas nc G20 20mbar G30 30 50mbar Hedef lke TR Cihaz Tipi A1 Kategori II 2H3B P retim...

Страница 5: ...time Never operate the product when there is no oil in the oil chamber min 5 liters of oil You damage the oil reservoir of the product SAFETY IN CLEANING AND MAINTENANCE While cleaning the device pres...

Страница 6: ...BSTITUTION The installation location of the device cannot be changed its connections cannot be extended or changed except our technical service or technical staff In case of change of location by tech...

Страница 7: ...able material Before installation safety details and suitability of installation conditions should be checked The gas connection is made to the device paying attention that the installation is in acco...

Страница 8: ...SETUP THE DISTANCE BETWEEN THE TUBE AND THE DEVICE SHOULD BE A MINIMUM 500 mm BETWEEN THE DEVICE AND THE SIDE WALLS THE MINIMUM MUST BE 200mm...

Страница 9: ...s such as collective food service establishments restaurants touristic facilities buffets NOTE Do not use it outside of its intended use It should be used by people who know the safety and technical c...

Страница 10: ...vice It is held down until the ignition of the key burner for 20 25 seconds after the ignition of the plot In order to put the device on standby the gas valve is turned to the off position and brought...

Страница 11: ...e maintenance of the device by our technical service personnel is subject to a fee in case of malfunctions resulting from lack of periodic maintenance and incorrect use The following details should be...

Страница 12: ...res Ak aburgaz Mah 4 Cad 153 Sok No 23 Esenyurt stanbul Tel 90 212 886 27 11 servis remta com tr www remta com tr lke ap nda t m yetkili servislerimizin adres ve telefon bilgilerine a a da belirtilen...

Страница 13: ...PARTS LIST...

Страница 14: ...NOTLAR...

Страница 15: ...NOTLAR...

Страница 16: ...GARANT ARTLARI R NLER M Z EEE Y NETMEL NE UYGUNDUR...

Страница 17: ...1 info remta com tr www remta com tr GAZLI FR T Z REMTA R94 R95 RL96 RL97 TESL M TAR H VE YER GARANT S RES 2 YIL AZAM TAM R S RES 20 G N SER NO SATICI F RMA NVAN ADRES TEL FAKS E POSTA FATURA TAR H VE...

Отзывы: