Functional test for
heating mode
(only for RXS...H)
1. Switch the supply voltage on.
2. Use the remote control to
switch on the unit and select
the heating mode, maximum
fan speed and highest target
temperature.
3. Measure and record all
the required values in the
commissioning report and
check the safety functions.
4. Check the control system for
the unit using the functions
described in the chapter
"Operation".
Timer, temperature setting, fan
speeds.
Final tasks
■
Re-fit all the dismantled parts.
■
Familiarize the operator with
the system.
Check that the stop valves
and valve caps are tight after
carrying out any work on the
refrigerant circuit. If necessary,
use appropriate sealant
products.
NOTE
21
Unit dimensions
We reserve the right to modify the dimensions and constructional design as part of the ongoing
technical development process.
RXW 261 / 351
275
790
200
275
RXW 521
930
200
1035
110
130
520
560
360
360
320
107
107
115
RXW 681
220
All data in mm
RXW 261 / 351
RXW 681
RXW 521
130
520
Downloaded from AC-Manual.com Manuals
Содержание RXW 261
Страница 2: ...Downloaded from AC Manual com Manuals ...