6
Commissioning
Before every commissioning the air inlet and outlet
openings should be checked for foreign bodies and
the air inlet filter must be checked for dirt. Blocked
or soiled grills and filters must be cleaned immedi-
ately, see "Care and maintenance" chapter.
Cooling mode
1.
Switch the unit on with the "I/O" key.
2.
Select cooling mode with the "MODE" key.
3.
Set the desired target temperature with the
"THERMO/TIMER CONTROL" keys. The
selected target temperature will be shown in
the display. If the fan speed selected is too
large or too small then this can be adjusted
with the "FAN" key.
Recirculation mode
1.
Switch the unit on with the "I/O" key.
2.
Select recirculation mode with the "MODE"
key.
7
Shutdown
NOTICE!
Never switch off the equipment by pulling out
the mains plug.
Temporary shutdown
If it is planned to shut down the unit for longer
periods e.g. during the winter, proceed as follows:
1.
Let the unit run in recirculating operation for
ca. 2 hours in order to dry the surfaces of the
evaporator fins. This will transport the
remaining moisture out of the unit and this
will avoid unpleasant odours when the unit is
re-commissioned.
2.
Switch the unit off with the "I/O" key, pull out
the power plug and wind up the power
supply. Ensure that the cable is not kinked or
too severely bent. The line can be fastened
to the rear of the unit.
3.
Place a suitable container underneath the
condensate drain of the internal reservoir.
The condensate drain is located on the lower
rear side of the unit.
4.
Pull out the stopper from the condensate
drain and collect the condensate that drains
out.
5.
Then insert the stopper once again. A
missing stopper or an incorrectly inserted
stopper will result in condensate leaking out
after re-commissioning.
6.
Store the unit in an upright position in a cool,
dry and dust-free location protected from
direct sunlight. Cover the unit with a synthetic
cover to protect it against dust if desired.
Permanent shutdown
The entire system should only be dismantled by a
specialist firm familiar with all environmental
aspects involved. REMKO GmbH & Co. KG or your
contractual partner will be pleased to provide a list
of refrigerant specialists in your area.
17
Содержание MKT 255 ECO S-Line
Страница 26: ...REMKO MKT ECO series 26...
Страница 27: ......