REMKO CLA 100 Скачать руководство пользователя страница 3

Sa f et y  Hi n t s

 

 
When using this unit make sure always to observe 
the applicable building- and fire-protection regula-
tions as well as the rules  of the trade cooperative 
association. 
 

The unit may be operated only by those persons who 
have been instructed accordingly. 

The unit is to be installed and operated in such a way 
as to ensure that the employees are not endangered 
by waste gases and radiation heat and that no fire 
can break out. 

The unit may only be installed and operated in rooms, 
when the air-rate fed to the unit is sufficient for com-
bustion. 

Mobile fuel reservoirs may be installed only when the 
technical rules for combustible liquids “TRBF 210 and 
280” are observed. 

Units 

without waste gas pipes 

my be operated only 

in well aerated rooms. 

Persons are not allowed to stay permanently in the 
room where the unit has been installed. Relevant pro-
hibition signs are to be fastened to the entrances. 

The unit is to be installed only on a non-combustible 
ground. 

The unit may not be installed and operated in in-
flammable and explosive surroundings. 

A safety zone of 1.5 m around the unit and a mini-
mum distance of 3 m at the unit’s waste gas opening 
are to be observed, even regarding non-combustible 
objects. 

The protective air suction lattice is always to be kept 
free from dirt and loose objects. 

Make sure not to introduce foreign matters into the 
unit. 

Make sure not to expose the unit to direct water jets. 

All electric cables outside the unit are to be protected 
from damage (e.g. caused by animals, etc.). 

Make sure always to pull the mains plug out of 
the mains socket when maintenance and repairs 
are carried out. 

An operation or use other than that indicated  

     in these operating instructions is prohibited!  

In case of non-observation we will not be held  
responsible and our guarantee will become void.

 

I n st a l l a t i o n   Re q u i r e -
m en t s 

 
The heaters may only be installed and operated in com-
pliance with the relevant regulations, especially regula-
tions governing the installation and operation of fire-
places and furnaces. 
  

Operators

 

 
The units may be operated only by persons who have 
been trained in this field. 
  

Installation

 

 
Install the heaters in a stable position. 

 
Install and operate the heaters so as to avoid any ha-
zard to the personnel by fumes and radiation heat, well 
as to avoid any risk of fire.  

 
The heaters may only be installed and operated inside 
rooms if they are supplied with sufficient air for combus-
tion and if the  flue gases escape into the open through 
flue-pipes.  

 
The air supply is sufficient for combustion when, for    
example, the cubic capacity of a room is at least ten 
times the nominal thermal load of all heaters in the 
room, and a natural exchange of air is ensured by me-
ans of windows and doors. 

 
Heaters without waste gas pipe may be used in rooms, 
provided that these are well aerated and the percentage 
of substances which are injurious to health in the brea-
thed in air do not reach inadmissible concentrations. 

 
The airing is sufficient when, for example, 

 
1.   the room capacity in m³ is at least 30 times the nomi-

nal thermal load in kW of all heaters in the room, and 
a natural exchange of air is ensured by means of 
windows and doors, or 

 
2.   there are air inlet and outlet openings, which cannot 

be closed, near the ceiling and the ground; the size 
of which in m² must be at least 0.003 times the nomi-
nal load in kW of all heating devices in the room. 

 
Do not install or operate the heaters in rooms or areas 
exposed to fire or explosion hazards.  
 

Room Drying  

 
The heaters may be operated in order to dry rooms with-
out evacuating the generated gases through waste gas 
pipes outside, if the air supplied to those rooms is suffi-
cient for combustion. Persons are not allowed to stay 
permanently in those rooms. Relevant prohibition signs 
are to be fixed at the entrances. 
  

Test

 

 
The units are to be tested depending on the operational 
conditions when necessary, but a least once a year as 
to their operational reliability. These tests are to be car-
ried out by an expert. 

Содержание CLA 100

Страница 1: ...CLA 25 100 Automatic Oil Gas Heater s Edition GB 709 Oper ation Technology Or iginal REMKO Spar e Par ts REMKO alles b r enstar k...

Страница 2: ...am 10 Troubleshooting Instructions 11 CLA 25 40 50 CLA 100 G Always keep these operating instructions near or on the device G Mobile oil gas heater s Oper ating instr uctions Make sure to read these i...

Страница 3: ...in com pliance with the relevant regulations especially regula tions governing the installation and operation of fire places and furnaces Operators The units may be operated only by persons who have...

Страница 4: ...ces Make sure to observe the following safety distances to ensure a safe operation of the unit towards the top without waste gas pipe 3 0 m towards the top fire retarding ceiling 1 5 m towards the sid...

Страница 5: ...tch 1 into 0 position OFF Safety Facility Triple combination control according to DIN 3440 The device has 3 functions 1 Fan Control TR The tripping point is set with the adjusting lever fan Rated valu...

Страница 6: ...essories which have been approved by our com pany The inside overlappings on the seams of the hot air hoses must run with the air current direction Make sure that the hoses and pipes respectively are...

Страница 7: ...ns we recommend that you conclude a maintenance contract Make sure to store the unit in a dust free and dry place when it is not used for a longer period Setting and maintenance is to be carried out o...

Страница 8: ...8 CLA 25 40 50 CLA 100 We reserve the right to make modifications in dimensions and construction in the interests of technical progress...

Страница 9: ...361 1108151 1108151 1108161 1108355 1108186 1108356 1102550 1102550 1102710 1108362 1108152 1108152 1108162 1108363 1102505 1102505 1102713 1108366 1102506 1102506 1102706 1108367 1108147 1108147 1108...

Страница 10: ...180 200 weight without burner kg 110 110 153 260 dimensions length total mm 1385 1385 1685 1955 width total mm 640 640 770 1020 hight total mm 930 930 1030 1240 Dimensions and specifications subject...

Страница 11: ...t up if so unlock relay by pressing the anti interference button The burner tries to start take delayed burner start due to oil preheating into account Attention If the burner is switched off once mor...

Страница 12: ...REMKO GmbH Co KG Klima und W rmetechnik D 32791 Lage Im Seelenkamp 12 D 32777 Lage Postfach 1827 Telefon 0 52 32 606 0 Telefax 0 52 32 606260...

Отзывы: