![REMKO BG 1000 Скачать руководство пользователя страница 7](http://html1.mh-extra.com/html/remko/bg-1000/bg-1000_installation-and-operating-manual_1439009007.webp)
7
Installation
To perform the installation, proceed as
follows:
1. Select the most suitable place to
install the fresh water station. Please
ensure that the area is appropriately
accessible for installtion and possible
servicing work (clearance of approx.
50 cm to the front and sides).
2. Seal the two supplied reducing
double nipples 6/4" x 5/4" and
screw into one of the top and
bottom connections.
3. Seal the two supplied plugs 5/4“
and screw into the two
corresponding connections in the
middle.
4. Move the preassembled fresh water
station into position, attach to the
two flat-sealing connections
(union nuts) on the top and bottom
reducing double nipples, then screw
tight.
5. Fill, bleed and flush the storage
tank and the fresh water station
and check all threaded connections,
for leak tightness, including those
inside the fresh water station.
Retighten them as needed!
Содержание BG 1000
Страница 1: ...REMKO FRESH WATER STATION BG 500 BG 800 BG 1000 Installation and operating manual Edition GB C06 ...
Страница 2: ......
Страница 15: ......