6
Installation
Unit installation
NOTICE!
Installation should only be performed by author-
ised specialists.
The unit is attached by means of a wall bracket,
considering the air discharge side located in the
lower part.
1.
Mark the mounting points on the structurally
permissible building sections according to the
dimensions of the wall bracket.
2.
If necessary, remove the break out opening
of the housing.
3.
Connect the refrigerant piping, electrical
cables and condensate drainage line to the
indoor unit as described below.
4.
Hang the indoor unit onto the wall bracket by
tilting it back slightly and by pressing the
bottom part of the unit against the bracket.
5.
Check again that the unit is level. (Fig. 22)
Fig. 22: Horizontal positioning
The wall bracket for the units must be attached
with suitable screws and anchors.
Connection of refrigerant piping
The refrigerant piping is connected (responsibility
of the customer) on the back side of the unit.
It may be necessary to fit a reducer or flared
adapter to the indoor unit. These fittings are
included with the indoor unit as an accessory kit.
Once installed, the connections should be insu-
lated to make them vapour diffusion proof.
NOTICE!
The unit is factory filled with dry nitrogen for
leak testing purposes. The pressurised nitrogen
is released when the union nuts are undone.
REMKO ATY
22
Содержание ATY 265
Страница 41: ...Resistance values for probes T1 T2 T3 and T4 K Ohm K Ohm K Ohm K Ohm 41...
Страница 42: ...Resistance values for probe T5 K Ohm K Ohm K Ohm K Ohm REMKO ATY 42...
Страница 49: ...49...
Страница 50: ...REMKO ATY 50...
Страница 51: ......