Caution
If possible, use the pump modulation signal. This provides the
most accurate pump control.
If the automatic burner unit does not support pump modulation,
the pump will behave as an on/off pump.
5.5.6
Connecting a PC/laptop
There is a Service connector next to the control panel. A Recom interface
can be used here to connect a:
PC
Laptop
Smart Service Tool
Using the Recom service software, you can enter, change and read out
various boiler settings.
Connecting and disconnecting an interface connector:
1. Move the Service connector slide upwards.
2. Push the interface connector into place. It should snap shut with a
click.
The interface connector is connected.
3. Maintain slight tension on the interface connector
4. Push the slide downwards. The interface connector will now be
released.
5. Pull the interface connector from the connector.
The interface connector is disconnected.
6 Preparation of commissioning
6.1
Checklist before commissioning
6.1.1
Filling the system
Important
In order to be able to read off the water pressure from the control
panel, the boiler must be switched on. If the water pressure is too
low, the boiler or the boiler pump will not start.
1. Fill the central heating system with clean tap water.
Important
The recommended water pressure is between 1.5 and 2 bar.
2. Check the water-side connections for tightness.
6.1.2
Filling the siphon
The siphon is supplied separately with the boiler as standard (including a
flexible plastic drain hose and a transparent extension hose for the
automatic air vent). Fit the siphon under the boiler.
Fig.38
Connecting an interface connector
AD-0000311-01
3
4
5
1
2
6 Preparation of commissioning
7701838 - v.09 - 10122021
31
Содержание Quinta Ace 135
Страница 74: ...13 Appendix 74 7701838 v 09 10122021...