7651255 - v.01 - 23052016
20
HFS 650 / HSF 700
5 . Quinta Pro + HFS
4 Installation
Legend CH boiler
1 CH supply 2 CH return TB Mount boiler sensor S43.946 on boiler terminal
Tdhw (see boiler doc)
Legend Quadro HFS vessel
1 Domestic hot water out R1
1
/
4
”
2 Supply – CH boiler connection R1
1
/
4
”
3 Return – CH boiler connection R1
1
/
4
”
4 Supply – solar R3/4” 5 Fill R3/4” 6 2nd return – CH boiler connection R1
1
/
4
”
7 Domestic cold water in R1
1
/
4
”
8 Solar return/CH boiler return line (without collector circuit) 1
1
/
4
”
9, 10, 1
1 immersion sleeve Ø16 mm
12 Thermometer
R1/2”
13 Manual air bleed Rp
1
/
2
” (not included)
14 2nd supply – solar connection R
3
/
4
”
15 Immersion sleeve Ø 7 mm S2 Boiler sensor bottom – HFS vessel in no. 9 TB boiler sensor part no. S43.946 CH boiler in no. 1
1
Max. 5 kW loss
See section 4.2.3
Thermal
management concept ISSO publication 55.1
Legionella circuit via boiler controller (see boiler doc.)
# Install domestic water portion in accordance with the applicable domestic water installation standards. For more information about the recirculation connection options, see the documentation for the recirculation connection set.
Содержание HFS 600
Страница 1: ...HFS 600 750 Installation and service manual Powerful domestic water boiler Great Britain en...
Страница 15: ...15 7651255 v 01 23052016 HFS 650 HSF 700 4 Installation Fit a manual bleed valve...
Страница 29: ...29 7651255 v 01 23052016 HFS 650 HSF 700 7 Maintenance report...
Страница 30: ...7651255 v 01 23052016 30 HFS 650 HSF 700 7 Maintenance report...