background image

11 

Gas 220 Ace Cascade Assembly Manual V 18042018

 

Adapter kit for Gas pipe kit 

The adapter kit consists of a 1” pipe-work section that will replace the equivalent 1

1/2

” pipe-work 

section from the standard kit.  
The replacement section has a 2” half union that will allow the connection to the standard gas pipe kit 
section connected to the gas collector. See following page for further information. 

Standard gas pipe kit 

Gas kit adapter 

 Fig.4 

Fasten the Gas adapter section to the Boiler gas connection using a thread sealant*. 

Connect the half union of the gas adapter section to the half union of the standard gas pipe kit 
section, connected to the gas collector. 

*

 

Pipe sealant complying with BS EN 751

Half union 

Gas adapter section

Содержание Gas 220 Ace

Страница 1: ...1 Gas 220 Ace Cascade Assembly Manual V 18042018 Gas 220 Ace Cascade Assembly Manual...

Страница 2: ...efficient operation we recommend that the product is serviced regularly Our service and customer service organisation can assist with this We hope you enjoy years of problem free operation with the p...

Страница 3: ...lange Details Page 7 General view of cascade kit Page 8 Boiler Pipe Kits Page 9 Assembly Instructions Page 10 Adapter Kits for Gas 220 Ace 160 Page 11 Adapter kit drawings Page 12 Important Notice Flo...

Страница 4: ...appliance The installer must observe the following instructions Read and follow the instructions given in the manuals provided with the appliance and cascade kit Install the appliance and cascade kit...

Страница 5: ...iguration heating boilers are connected hydraulically If the heat demand increases or decreases boilers are switched on or off respectively by the external controller BMS etc supplied by others It is...

Страница 6: ...flange DN65 Gas Pipe flange details PN16 EN 1092 1 flange DN125 Secondary flow and return on low loss Header flanges details PN16 EN 1092 1 flange Kits from 1250kW to 2400kW For higher output cascade...

Страница 7: ...with corrugated flexible pipe sections that allow for small miss alignments and make site installation easier The factory made threaded joints are sealed with a hard setting compound Adjustment of th...

Страница 8: ...le pipes fitted on the Flow and Return pipe kits An isolation valve is provided on the Gas pipe kit Assembly instructions Use the guidelines and the required installation space as a basis for determin...

Страница 9: ...the collector s floor support stand is not required fix the collectors to the wall Make sure that it is a solid wall capable of bearing the collectors weight 8 Position the Gas collector so that the...

Страница 10: ...with the Low loss header flanges 19 Make a final visual inspection of all joints and pipe work Pipe sealant complying to BS EN 751 Adapter kit for Gas 220 Ace 160 boilers The pipe kits are designed f...

Страница 11: ...low the connection to the standard gas pipe kit section connected to the gas collector See following page for further information Standard gas pipe kit Gas kit adapter Fig 4 Fasten the Gas adapter sec...

Страница 12: ...hall not be positioned after an isolating valve Fig A Fig B CORRECT INCORRECT If the Safety valve is positioned in error as per fig B before connecting the Flow pipe kit to the Flow collector you must...

Страница 13: ...he boiler pump The supplied Grundfos Magna 1 40 60F pump must be connected to the boiler via a pump relay contactor The switching signal to the relay contactor is supplied by the connections marked pu...

Страница 14: ...ipe kits to DN150 pipe kits is when the total heat output is above 1250kW Total boiler outputs below 1250kW will use the DN100 Kits No of Boilers Total KW In Line Kits Remeha Kit Reference Items Suppl...

Страница 15: ...Boilers Total KW In Line Kits Remeha Kit Reference Items Supplied in Kit 5 X Gas 220 300 1455 DN 150 No Kit reference LLH15 1GA15 2GAL15 2GAL15 6 X Gas 220 250 1500 DN 150 No Kit reference LLH15 2GAL...

Страница 16: ...3 X Gas 220 300 872 7 DN 100 KTSGA3B LLH10 1GA10 2GAB10 4 X Gas 220 160 608 4 DN 100 KTSGA4B LLH10 2GAB10 2GAB10 4X160ADAP 4 X Gas 220 200 777 6 DN 100 KTSGA4B LLH10 2GAB10 2GAB10 4 X Gas 220 250 973...

Страница 17: ...KTSGA7B2 00 300 LLH15 1GA15 2GAB15 2GAB15 2GAB15 8 X Gas 220 160 1217 DN 150 KTSGA8B LLH15 2GAB15 2GAB15 2GAB15 2GAB15 8 X160ADAP 8 X Gas 220 200 1555 DN 150 KTSGA8B LLH15 2GAB15 2GAB15 2GAB15 2GAB15...

Страница 18: ...kets 2 10 1 5 Rubber Gasket 1 11 M20 X 80 Screws 24 12 M20 Nuts 24 13 A20 Washers 24 14 Collectors Support Stands 2 15 Mounting Bolt Kit 8 List of Materials Supplied with DN150 Cascade Kits 2GAL15 No...

Страница 19: ...or two boilers back to back 1 2 Return Collector DN150 for two boilers back to back 1 3 Gas Collector DN100 for two boilers back to back 1 4 Flow Pipe Kit 2 5 Return Pipe Kit 2 6 Gas Pipe Kit 2 7 DN10...

Страница 20: ...ector 1 6 DN100 Gaskets 4 7 Gas DN65 Gasket 1 8 M16 X 70 Screws 32 9 M16 Nuts 32 10 A16 Washers 32 1GA10 No Description Pcs 1 Flow Collector DN100 for one Boiler 1 2 Return Collector DN100 for one Boi...

Страница 21: ...s Pipe Kit 2 7 DN 100 Gasket 2 8 DN65 Gasket 1 9 2 Union Gasket 4 10 1 5 Union Gasket 2 11 M16 X 70 Screws 24 12 M16 Nuts 24 13 A16 Washers 24 14 Collectors Support Stands 2 15 Mounting Bolt Kit 8 2GA...

Страница 22: ...22 Gas 220 Ace Cascade Assembly Manual V 18042018 2GAB10 Cont d No Description Pcs 11 M16 X 70 Screws 24 12 M16 Nuts 24 13 A16 Washers 24 14 Collectors Support Stands 2 15 Mounting Bolt Kit 8...

Страница 23: ...Assembly Manual V 18042018 CONTACT US Innovation House 3 Oaklands Business Centre Oaklands Park Wokingham RG41 2FD T 0118 978 3434 E info remeha co uk W remeha co uk a Baxi Heating brand Registered i...