Retractable Bollard Installation
R-8471/R-8472
Parts List
Installation Equipment
#
PART
QTY
1
Retractable Bollard Assembly
1
2
Retractable Bollard Receiver
1
3
Key
1
4
Reflective Tape
1
Auger
Measuring Tape
Level
Chalk/Marker
Dirt Tamper
To protect the finish, keep bollards in original
packaging until exact moment of installation.
Handle with care to avoid scratching or
damaging bollard surfaces.
Once scratched, bollards cannot be repaired
to original form without re-finishing the entire
surface.
Consider local soil conditions before proceeding
with bollard installation.
Before Installation
STEP 1:
Study the site plans and mark the intended
location of each bollard on the plan.
STEP 2:
Always check for hazards such as water pipes,
gas lines, and underground wiring before digging.
STEP 3:
Dig a hole to a minimum depth of 54". The
diameter of the hole should extend to a minimum of 14".
SECTION AP-AP
SCALE 0.3 : 1
AP
AP
PARTS LIST
DESCRIPTION
PART
NUMBER
QTY
ITEM
R8471
Retract
able
Bollard
Assem
bly
R8471
1
1
R8471
R
Retract
able
Bollard
Receiv
er
R8471
R
1
2
Option
al
Reflect
ive
Tape,
Max.
1-1/8"
Width
Reflect
ive
Tape
(Optio
nal)
1
3
1
2
4
3
54" min.
14
" min.
STEP 4:
Center the auger on the installation mark and
bore a hole to the required depth and diameter.
STEP 5:
Ensure the area is properly formed to create a
perimeter that will hold wet concrete. Use a dirt tamper**
to compact the soil below the intended surface.
** Dirt tamping is not required if working on undisturbed soil