Reliance Foundry R-8471 Скачать руководство пользователя страница 1

1-877-789-3245  |  [email protected]  |  www.reliance-foundry.com

Retractable Bollard Installation

R-8471/R-8472

Parts List 

Installation Equipment

#

PART

QTY

1

Retractable Bollard Assembly

1

2

Retractable Bollard Receiver

1

3

Key

1

4

Reflective Tape

1

Auger

Measuring Tape

Level

Chalk/Marker

Dirt Tamper

To protect the finish, keep bollards in original 

packaging until exact moment of installation.

Handle with care to avoid scratching or 

damaging bollard surfaces. 

Once scratched, bollards cannot be repaired 

to original form without re-finishing the entire 

surface.

Consider local soil conditions before proceeding 

with bollard installation.

Before Installation

STEP 1: 

Study the site plans and mark the intended 

location of each bollard on the plan. 

STEP 2: 

Always check for hazards such as water pipes, 

gas lines, and underground wiring before digging. 

STEP 3: 

Dig a hole to a minimum depth of 54". The 

diameter of the hole should extend to a minimum of 14". 

SECTION AP-AP

SCALE 0.3 : 1

AP

AP

PARTS LIST

DESCRIPTION

PART

NUMBER

QTY

ITEM

R8471 

Retract

able 

Bollard

 

Assem

bly

R8471

1

1

R8471

Retract

able 

Bollard

 

Receiv

er

R8471

R

1

2

Option

al 

Reflect

ive 

Tape, 

Max. 

1-1/8" 

Width

Reflect

ive 

Tape 

(Optio

nal)

1

3

1

2

4

3

54" min.

14

" min.

STEP 4: 

Center the auger on the installation mark and 

bore a hole to the required depth and diameter.

STEP 5: 

Ensure the area is properly formed to create a 

perimeter that will hold wet concrete. Use a dirt tamper** 

to compact the soil below the intended surface.

** Dirt tamping is not required if working on undisturbed soil

Отзывы: