Reliance Foundry R-7530 Скачать руководство пользователя страница 2

Decorative Bollard Installation

Adhesive Anchoring

1-877-789-3245  |  [email protected]  |  www.reliance-foundry.com

4"

4"

PARTS LIST

DESCRIPTION

PART

NUMBER

QTY

ITEM

R7530 Base

R7530B

1

1

Drop-in 

Concrete 

Insert 3/4" - 

requires 1" x 

3 1/8" hole 

(dia. x depth)

Drop-in 

Concret

e Insert 

3/4"

1

2

R7500 

Threaded 

Bar 3/4" x 

30"

R7500B

AR 3/4"

1

4

R7530 Cap

R7530C

1

7

Hexagon 

Socket Set 

Screw 3/8" x 

3/4" - 

requires 

3/16" hex key

Hexago

Socket 

Set 

Screw 

3/8" x 

3/4"

1

8

Polyethylene 

Plug 3/8"

Polyethy

lene 

Plug 

3/8"

1

9

Install Plastic

Screw Cap

A

STEP 8

STEP 12

STEP 13

STEP 11

STEP 14

STEP 15

R-7530

Inspect the installation

. Abrasions should be 

covered as soon as possible. For damage repair 

or other servicing needs, please contact Reliance 

Foundry’s sales department.

Secure the Bollard

STEP 7:

 Clear the hole of all debris and/or standing water 

using the vacuum. Use a brush to remove any remaining 

loose particles.

STEP 8: 

Using the caulking gun, dispense the adhesive from 

the bottom up until the hole is one-quarter full. Prevent air 

pockets by withdrawing the mixing nozzle slowly.

  

STEP 9: 

Carefully place the bollard near the installation 

position. When ready to install, remove its protective 

packaging.

STEP 10: 

Set the bollard base upright and maneuver it so 

the center lines up with the drilled hole.

STEP 11:

 Lower the threaded rod through the top of the 

bollard and into the drilled hole.

STEP 12:

 Insert the threaded rod the full 4

"

 into the drilled 

hole while turning for positive adhesion. The rod should 

be centered in the bollard’s shaft. 

Note: A minimum of 45 

minutes at 68˚F is required for the anchoring system to set.

STEP 13: 

Place the washer over the threaded rod so it 

rests on top of the bollard base. Apply the 1" nut to the 

threaded rod and use a wrench to tighten until the bollard 

is secure.

STEP 14: 

Remove the bollard cap from packaging and place 

on top of the shaft of the bollard. Secure and align the 

bollard cap to the bollard base with the three set screws. 

Tighten in equal amounts to ensure the cap remains 

centered.

  

STEP 15: 

Place the plastic plugs

 (A)

 over the heads of the 

set screws.

Отзывы: