background image

Custom Program #1 

(For New York City Compliance)
Single Interlock Programming Instructions for 
New York City Compliance (Single Hazard, 2 Alarm 
Zones, 1  Water

fl

 ow Zone, and 2 Supervisory Zones)

1.  Apply power to the panel.
2.  Slide the program switch down.
3.  Press the FUNCTION button until the display reads “PASS-

WORD=000.”

4.  To enter a password, press the SELECT button until the 

proper number is displayed above the “^” symbol; then 
press the SET button to move to the next digit.  After enter-
ing the third number, the display will change (All panels are 
shipped with a “000” password).

5.  Press the FUNCTION button until the display reads “PRO-

GRAM ##” (the second “#” character refers to the current 
program number between “0” and “24”).

6.  Press the SELECT button until the display reads “PRO-

GRAM #6.”

7.  Press the SET button.
8.  Slide the program switch up.
9.  Slide the program switch down.
10.  Apply steps 3 to 5.

11. Press the SELECT button until the display reads “PRO-

GRAM #0.”

12.  Press the SET button.
13.  Press the FUNCTION button until the display reads “OUT-

PUT 1: INDICATING.”

14.  Press the SET button until the display reads “OUTPUT #2: 

INDICATING.”

15.  Press the SELECT button until the display reads “TROUBLE 

BELL.” Press the SET button.

16.  Press the FUNCTION button until the display reads “ZONE 

1 OUTPUTS.” The “v” is pointing to the first available out-
put for the zone indicated on the display. If the number is 
displayed, it is turned on for that zone.  If the number is not 
displayed, the zone is turned off. 

17.  Press the FUNCTION button until the display reads “ZONE 

3 OUTPUTS.”

18.  Press the SELECT button. The “1” should appear under the 

“v”.

19.  Press the SET button twice. The panel is completely pro-

gramed except for the custom banner and zone mes-
sages. If these messages are not desired, then slide the 
program switch back up.

INPUTS: 

1 conventional zones, 1  manual release zone, 1  waterflow zone, 1 low air zone, 1 supervisory zone.

OUTPUTS: 

1 general alarm bell, 1 trouble bell, 1 supervisory bell, and 1 solenoid release circuit.

OPERATION:  Activation of either the conventional zone or the manual release will operate the solenoid release 
  

circuit and the general alarm bell.

 

Activation of the waterflow zone will operate the general alarm bell.

 

Activation of either the low air zone or the supervisory zone will operate the supervisory bell.

 

A trouble condition (low battery, wiring problem, etc.) will operate the trouble bell.

 

When either Zone #1 or #2 is in alarm, Output #1 (general alarm) and Output #4 (solenoid release) 

 will 

operate.

 

When Zone #3 is in alarm, Output #1 (alarm bell) will operate.

 

When either Zone #4 or the supervisory zone is activated, Output #3 (supervisory bell) will operate.

 

When the panel is in a trouble condition, Output # 2 (trouble bell) will operate.

* The Butter

fl

 y valve in the PrePaK assembly is connected to Supervisory 2 input of the Potter PFC-4410RC

Releasing/Control panel.

Refer to the “Installation, Operation and Instruction Manual” for the PFC-4410-RC Releasing 
Control Panel for Additional Information.

POTTER PROGRAM #1

OUTPUTS

ZONES

*Supervisory 2

#1

Conventional

#2 

Manual release

#3

Water

fl

 ow

#4

Low Air

 Supervisory

#1 ALARM

X

X

X

#2 TROUBLE

#3 SUPERVISORY

X

X

#4 RELEASE

X

X

25.

Содержание DDX PrePaK D

Страница 1: ...ouble Interlock Electric Electric Release Contents Page General Description 2 Listings and Approvals 4 Technical Data 4 Installation Requirements 5 System Operation 5 6 System Reset Procedure 6 Inspec...

Страница 2: ...tection are permitted by all applicable codes and standards as well as the requirements of all authorities having jurisdiction Cross zoned detection may not be permitted in New York City or by Factory...

Страница 3: ...Fig 1 3...

Страница 4: ...1350lbs 531kg 4 Dimensions System Size Cabinet Dimensions 4 100 mm 6 150 mm 25 7 W x 28 9 D x 68 H 0 65 m W x 0 73 m D x 1 73 m H 8 200mm 30 W x 36 D x 74 H 0 76m W x 0 91m D x 1 88m H 5 Grooved End...

Страница 5: ...that contains the 120 220 VAC connections The Reliable Model DDX PrePaK is delivered with five factory installed electrical devices They consist of the following 1 A system air pressure switch which i...

Страница 6: ...e controlling water supply to the deluge valve and close the air shutoff valve valve J 2 Close the pushrod chamber supply valve valve A 3 Open the main drain valve valve B and drain system 4 Open all...

Страница 7: ...e leasing control panel by operating two detectors For dou ble interlock applications close valve J and open valve H Doing so will discharge the sprinkler system s air pressure 4 Step 3 should result...

Страница 8: ...R TBL SYSTEM TBL SUP TBL GROUND FAULT SUP 1 ABORT SUPERVISORY 2 COMMON ALARM ALARM SILENCE STEADY DISCHARGED FLASHING PRE DISCHARGE RUN PROGRAM SET SELECT FUNCTION SCROLL DOWN BUZZER SILENCE SIGNAL SI...

Страница 9: ...9 Fig 3...

Страница 10: ...10 Fig 4...

Страница 11: ...Fig 5 11...

Страница 12: ...Fig 6 12...

Страница 13: ...13 Fig 7...

Страница 14: ...Fig 8 Wiring Diagram 14...

Страница 15: ...15 Fig 9...

Страница 16: ...Fig 10 16...

Страница 17: ...programmed except for the cus tom banner and zone messages Slide the program switch back up 17 INPUTS 1 conventional zone 1 manual release zone 1 waterflow zone 1 low air zone 1 supervisory zone OUTPU...

Страница 18: ...18 Fig 11 Wiring Diagram...

Страница 19: ...visory bell 1 solenoid release circuit OPERATION Activation of both conventional zones at the same time will operate the solenoid release circuit and thegeneral alarm bell Activation of either convent...

Страница 20: ...20 Fig 12...

Страница 21: ...tion zone and the low air alarm zone at the same time will operate the solenoid release circuit and the general alarm bell Activation of the conventional zone only will operate the general alarm outpu...

Страница 22: ...22 Fig 13...

Страница 23: ...ase circuit OPERATION Activation of both conventional zones and the low air alarm zone at the same time will operate the solenoid release circuit and the general alarm bell Activation of either conven...

Страница 24: ...24 Fig 14...

Страница 25: ...the FUNCTION button until the display reads ZONE 3 OUTPUTS 18 Press the SELECT button The 1 should appear under the v 19 Press the SET button twice The panel is completely pro gramed except for the c...

Страница 26: ...26 Fig 15...

Страница 27: ...3 1 1 2 Hp 120 VAC 60 Hz Air Compressor Not Available in the 4 100 mm Assembly 0 1 0 No Releasing Control Panel 1 Potter PFC 4410 RC Releasing Control Panel Air Compressor Voltage Unit Size Releasing...

Страница 28: ...U S A 10 16 P N 9999970306 The equipment presented in this bulletin is to be installed in accordance with the latest published Standards of the National Fire Protection Association Factory Mutual Rese...

Отзывы: