BIG WHEEL
ALLEN SCREW
HANDLE
NEW DRIVEŁ
BELT COVER
5/32" ALLEN KEY
1/8" ALLEN KEY
NEW BELT
7
Install the BIG WHEEL on the
end of the shaft making sure
that the teeth on the wheel are
facing the sowing head.
8
Tighten the BIG WHEEL on the
1/8” Allen key provided.
9
Install the new mail drive belt.
Slip the drive belt over the BIG
WHEEL first and then slip the
belt over the small idle pul-
ley at the back. Turn the small
pulley slowly clockwise to make
sure that the belt is properly in
place.
10
Put back in place the stop
motion screw & clamp motion
washer. Put back in place the
stop motion clamp stop screw.
11
Install the new belt cover on by
two screws.
12
For hand crank operation only,
install the handle to the BIG
WHEEL by tightening the Allen
screw with the 5/32” Allen key
provided.
28
Содержание BARRACUDA 200ZW
Страница 1: ...INSTRUCTION MANUAL BARRACUDA 200ZW PORTABLE WALKING FOOT SEWING MACHINE ...
Страница 2: ......
Страница 8: ...WINDING THE BOBBIN 3 4 2 5 1 03 ...
Страница 9: ...THREADING THE MACHINE AND NEEDLE 3 6 4 5 2 1 7 8 6 5 04 ...
Страница 12: ...ADJUSTING THE NEEDLE THREAD TENSION ADJUSTING THE bobbin TENSION 07 ...
Страница 15: ...CONSTRUCTIONAL 10 ...
Страница 20: ...13 6 15 14 16 17 4 3 5 4 2 1 19 19 18 10 9 9 11 12 20 7 8 6 GROUP 3 SHUTTLE TRANSMISSION GROUP 15 ...
Страница 36: ......
Страница 37: ......
Страница 38: ......
Страница 39: ......
Страница 40: ...1 800 268 1649 www reliablecorporation com ...