Reka TR 50.4 Скачать руководство пользователя страница 7

5

Setting the Working Temperature of the Hot-

Melt (TR 50.4)

After having started the applicator, wait for approx.
10 minutes and check the working temperature at the
thermometer. If necessary, correct the temperature at the
thermostat.

● Clockwise = higher temperature
● Anti­clockwise = lower temperature

Minor leaking out of the nozzle during the heat­up phase
is due to the hot­melt expanding in the nozzle/heating
chamber. As soon as the working temperature is
reached, the hot­melt will stop leaking.

Stand including Pressure Regulator and

Manometer

The precision adjustment for the compressed air
regulates your glue application. The set pressure may be
read from the indication of the manometer.

● When you use the stand for depositing the applicator,
remove the wire stand.
● Connect the compressed­air hose to the rear side of
the stand. Connect the glue applicator and the stand
with the compressed­air hose which is firmly fitted to
the glue applicator. (TR 50.4 / 55 / 700 / 70)
● Pressure controller on the right = air for glue output
2 ­ 4 bars* (Stand for Storing 2770 and TR 60 / 80)
● Pressure controller on the left = air for spray air
discharge 1 ­ 2 bars* (TR 60 / 80)

Working with a Balancer (Suspender)

If the glue applicator is fixed to a balancer (suspender), it
is recommended to use the suspension # 10436.
Thereby it is avoided that, by a wrong positioning,
glue gets into the vent valve.

This applies to glue applicators TR 50.4, TR 55, TR 60,
TR 700, TR 70, TR 80.

Working with Stationary Equipment

(in connection with pneumatic foot switch)

Warning:
Risk of burns! When, in the stationary
mode of operation, workpieces are
passed below the glue applicator by
hand, there is a risk of burns; so, it is
absolutely necessary that you wear
protective gloves.

First, mount the pneumatic foot switch and the stationary
equipment. The relevant instructions are supplied
together with the respective accessories. To connect the
system, proceed as follows:

General Notice on Hot-Melt Working

Temperature (all Applicators)

Please note:
The temperature regulation is not calibrated! If an exact
temperature is required, use a calibrated thermometer to
check the temperature. Please also note that the outside
temperature of the melting tank differs from the actual
temperature inside the melting tank.

Measuring Point at Melting Tank

* Depending on the glue type and the desired quantity to be applied

● Press the trigger down and
hold it.

● Put the enclosed plug into the
borehole provided for this purpose
at one side of the casing handle.

● Release the trigger.

● The trigger is locked.

The heating temperature should be lowered during longer
work breaks to preserve the hot­melt. Ongoing heating
makes the hot­melt coke and may also change its'
characteristics.

All manuals and user guides at all-guides.com

Содержание TR 50.4

Страница 1: ...50 4 TR 55 LCD TR 60 LCD TR 700 TR 70 LCD TR 80 LCD Product Manual for Pneumatic Reka Glue Guns Translation from German to English All manuals and user guides at all guides com a l l g u i d e s c o...

Страница 2: ...nd Maintenance 8 Trouble Shooting 10 Environmental Protection 11 Additional Information 11 EU Declaration of Conformity 12 Spare Parts Technical Specifications Accessories TR 50 4 14 TR 55 LCD HT 16 T...

Страница 3: ...enstein Leopoldshafen June 1st 2013 The applicator works with hot glue which is dispensed by a pneumatic conveying system Therefore this glue applicator should only be used by trained instructed and a...

Страница 4: ...g the Information Available This operating manual shall always be kept at the place of operation of the applicator Be sure that all persons handling the applicator can consult the instructions at any...

Страница 5: ...eplaced liquid glue might leak out Never bring the hot nozzle into contact with the cable Never direct the glue jet towards people Wear protective gloves and safety goggles whenever you work with the...

Страница 6: ...nozzle clean and free of foreign matters Has the heat up time of approx 10 minutes depending on glue type been kept Is hot melt glue in the melting tank Setting the hot melt working temperature all LC...

Страница 7: ...on 10436 Thereby it is avoided that by a wrong positioning glue gets into the vent valve This applies to glue applicators TR 50 4 TR 55 TR 60 TR 700 TR 70 TR 80 Working with Stationary Equipment in co...

Страница 8: ...tor has warmed up there is a risk of burns If when changing the cartridge another type of glue is used the nozzle must be rinsed thoroughly see chapter Cleaning of the Nozzle Nozzle Adapter Preparatio...

Страница 9: ...d to the applicator if this is not the case attach it The spray cap 3088 must be screwed on slightly by hand never use any tools You are advised to wear protective gloves Do not turn off the spray air...

Страница 10: ...n in the operating manual the glue applicator does normally not need cleaning The nonreactive glue contained in the applicator will remelt and can be used for glueing again The working temperature of...

Страница 11: ...when the applicator is ready for operation by depositing the glue applicator on a level plane using its wire bracket depositing the glue applicator on the stand 2770 included in TR 60 TR 80 suspendin...

Страница 12: ...e fault indications and assistance in trouble shooting In case of damage send the glue applicator to Reka indicating type and serial no of your applicator Self made repairs void the warranty All manua...

Страница 13: ...Reka Klebetechnik can be recycled completely Please take instructions for the disposal of hot melt glues and hot melt cartridges from the respective safety specifications Additional Information Do you...

Страница 14: ...108 EC until 28 12 2009 89 336 EEC from 29 12 2009 2006 42 EC 2002 95 EC The following standards have been applied IEC CISPR14 IEC 60335 IEC 60204 IEC 61000 This declaration of conformity shall get in...

Страница 15: ...1 3 TR 50 4 TR 55 LCD TR 60 LCD TR 700 TR 70 LCD TR 80 LCD Spare Parts Technical Specifications Accessories All manuals and user guides at all guides com...

Страница 16: ...661 3660 2613 2683 2693 3016 2697 3051 2800 2801 2819 2820 2802 2603 2696 3665 2883 2885 2718 2692 2694 2695 3088 2616 2955 2953 2124 2617 2533 2621 2882 name of article Lid A for TR 50 4 60 Lid D for...

Страница 17: ...200 C Consistency of temperature 5 C Temperature indication analog Heat up time approx 3 10 min Gross Tank Capacity 250 ml Conveying system Air pressure Operating pressure 0 5 6 bar Length of electri...

Страница 18: ...7 3661 3660 2613 2683 2693 3016 2697 3051 2800 2801 2819 2820 2802 2603 2696 3665 2883 2885 2718 2692 2694 2695 3088 2616 2955 2953 2124 2617 2533 2621 2882 name of article Lid A for TR 50 4 60 Lid D...

Страница 19: ...Temperature monitor Operating temperature 50 210 C 50 210 C 50 250 C 50 250 C Consistency of temperature 2 C Temperature indication digital Heat up time approx 3 10 min Gross Tank Capacity 330 ml Con...

Страница 20: ...3660 2613 2683 2693 3016 2697 3051 2800 2801 2819 2820 2802 2603 2696 3665 2883 2885 2718 2692 2694 2695 3088 2616 2955 2953 2124 2617 2533 2621 2882 name of article Lid A for TR 50 4 60 Lid D for TR...

Страница 21: ...nsistency of temperature 2 C Temperature indication digital Heat up time approx 3 10 min Gross Tank Capacity 250 ml Conveying system Air pressure Operating pressure 0 5 6 bar Length of electric cord 4...

Страница 22: ...t No 3657 3661 3660 2613 2683 2693 3016 2697 3051 2800 2801 2819 2820 2802 2603 2696 3665 2883 2885 2718 2692 2694 2695 3088 2616 2955 2953 2124 2617 2533 2621 2882 name of article Lid A for TR 50 4 6...

Страница 23: ...0 C Consistency of temperature 5 C Heat up time approx 3 10 min Gross Tank Capacity 310 ml Conveying system Air pressure Operating pressure 0 5 6 bar Length of electric cord 8 5 m Recommended melts 31...

Страница 24: ...7 3661 3660 2613 2683 2693 3016 2697 3051 2800 2801 2819 2820 2802 2603 2696 3665 2883 2885 2718 2692 2694 2695 3088 2616 2955 2953 2124 2617 2533 2621 2882 name of article Lid A for TR 50 4 60 Lid D...

Страница 25: ...Temperature indication digital Operating temperature 50 210 C 50 210 C 50 250 C Consistency of temperature 2 C Heat up time approx 3 10 min Gross Tank Capacity 310 ml Conveying system Air pressure Op...

Страница 26: ...83 2693 3016 2697 3051 2800 2801 2819 2820 2802 2603 2696 3665 2883 2885 2718 2692 2694 2695 3088 2616 2955 2953 2124 2617 2533 2621 2882 name of article Lid A for TR 50 4 60 Lid D for TR 55 Lid C for...

Страница 27: ...rature indication digital Heat up time approx 3 10 min Gross Tank Capacity 310 ml Conveying system Air pressure Operating pressure 0 5 6 bar Length of electric cord 4 m Length of connections stand to...

Страница 28: ...betechnik GmbH Co KG Siemensstra e 6 DE 76344 Eggenstein Telephone 49 721 970 780 Telefax 49 721 705 069 E Mail sale reka klebetechnik de Internet http www reka klebetechnik de All manuals and user gu...

Отзывы: