1   Safety 

 

 

 

1.1 

1.1 General 

The fan meets the technical safety standards 
applicable in the EC at the time of delivery. The 
rules and regulations for the prevention of accidents 
applicable at the time of delivery were taken into 
account in the fan design. 

The technical design meets DIN 24166 standard 
“Technical delivery conditions for fans”. 

It is not allowed to modify the original condition of 
the fan without the approval of Reitz. The warranty 
expires when parts other than original Reitz spare 
parts and/or purchased parts not corresponding to 
the original parts are used. 

Any variation or repair work has to comply with the 
brochure ”Safety instructions for the application of 
Reitz products”. Please request the brochure from 
us if it has not yet been supplied.

 

The operating manual and any required 
supplementary manuals must be available to the 
operator. 

It must be ensured that fans which are installed at 
high levels can only be reached via stages 
especially installed for this purpose. 

All devices and installations provided to prevent 
noxious substances from escaping must be checked 
before the fan is put into operation. 

Do not bypass, loosen of remove guards 
and protective devices. 

Do not open inspection ports and/or other openings 
when the fan is in operation. 
 

Содержание MEE

Страница 1: ...erating Manual Single stage radial fan Model MEE KONRAD REITZ VENTILATOREN GmbH Co KG Konrad Reitz Stra e 1 D 37671 H xter Albaxen Germany Telephone 49 0 52 71 964 000 Telefax 49 0 52 71 964 119 Email...

Страница 2: ...4 2 Transport 4 1 4 3 1 Storage 4 2 4 3 2 Stand by operation 4 2 4 4 Installation site 4 2 4 5 Electrical connection 4 3 4 6 Inspection 4 4 4 6 1 Mechanical testing 4 4 4 6 2 Electrical testing 4 4 5...

Страница 3: ...ponding to the original parts are used Any variation or repair work has to comply with the brochure Safety instructions for the application of Reitz products Please request the brochure from us if it...

Страница 4: ...y information 1 3 Start up The fan may only be put into operation also for testing when the inlet and discharge ports are provided with suitable guards plate shutters or when the fan is ducted Before...

Страница 5: ...tightened Close all inspection openings and tighten the bolts and nuts The fan can then be put into operation again 1 5 Cleaning Do not clean moving parts when the fan is in operation Before cleaning...

Страница 6: ...t the power supply to the fan and use mechanical means to ensure that power supply cannot be switched on again Use a voltage tester to check that the circuit is dead Connect and short the work site to...

Страница 7: ...No Fan data at a density of A 1 2 kg m3 Inlet temperature C Volumetric flow V1 m3 min Total press increase pt2 daPa Total press increase pt1 daPa Shaft rating PW kW Speed n 1 min Working temperature C...

Страница 8: ...an is to be used e g another medium These conditions are also entered on the fan data sheet 2 2 Warranty The warranted data refer to single values and testing conditions in accordance with the applica...

Страница 9: ...heet The shaft passage is sealed with a graphite cord This seal is not completely tight For special shaft seals please refer to the information provided in the annex 3 2 Options Accessories are availa...

Страница 10: ...facilities which are appropriate for the conditions on the site where the fan is to be installed Observe the applicable rules and re gulations for the prevention of accidents For lifting and transport...

Страница 11: ...se note the storage and preservation instructions for motors 4 3 2 Stand by operation In case of long term standstill periods please note the relevant instructions for the storage of motors 4 4 Instal...

Страница 12: ...ar and monitoring devices are sufficiently dimensioned to cope with the transient behaviour and current peaks It must be ensured that the supply of cooling air to the electric motor is not hindered Th...

Страница 13: ...from the fan housing Check all screw couplings and bolted connections Check all connections to duct work 4 6 2 Electrical testing The electrical system of the fan may only be tested by a qualified el...

Страница 14: ...ster controller Switch on the fan The fan may only be switched on when it is ducted and when it is certain that there will be a sufficient plant resistance after the fan motor has reached its full ope...

Страница 15: ...on the type of rotor This high power input must be taken into account when the fuse sizes are determined The connecting frequency of the electric motors must not exceed six activations per hour The in...

Страница 16: ...r must be serviced in accordance with the motor s lubricating instructions 6 1 2 Shaft seal Lubricate the seal once a month use an oil can to pour a small amount of machine oil in the gap between the...

Страница 17: ...ft seal Seal is faulty or worn Replace seal Fan produces a grinding noise Impeller rubs against inlet nozzle Loosen housing cover an re align check and correct duct work if necessary Motor noise Check...

Страница 18: ...onal plate shutters Motor protection system is not strong enough Cable cross section and protective system must withstand starting current during acceleration Starting time is too long Close dampers c...

Страница 19: ...plate Exact address of the user Name of the person our fitter should get in touch with If possible a description of the malfunctions visible audible An exact description will allow us to help you more...

Отзывы: