9
Installation
The equipment delivered is ready for immediate use. The sealed plug can be connected
directly to the mains supply 230 V/16 A. For installation please refer to chapter 2.
Operation
Chronological run of operation
1. Operate the
device only when it’s filled with water. (Pay attention to safety notes in
chapter 2) In order to avoid an unwanted dry-run, a daily filling in the morning is
recommended. Turn the heating controller (5) completely to the left (if necessary ventilate
tank by activating steam gun). Note: Fill the device only in a cold state. Open the tank
cap (6) and fill in distilled or decalcified water up to the edge (a filling funnel is
recommended). Close the tank cap (6) and hand-tighten it.
2. Turn the device on with the switch POWER (2). Set heating control (5) to max. If you
don’t set heating controller to max., the “low water level“ indicator lamp lights up (4)
despite a filled tank. However the device is ready for operation, but at a low temperature.
The heating starts automatically. After approx.18 min., pressure has been achieved and
the indicator lamp goues out if the heating controller was is set to max..
3. Start the hose heating with the switch HEATING (3) ein.
4. The maximum steam pressure can be modified with the heating controller (5). (Pressure
is only built up in the upper quadrant of the controller range. Pressure is built up with
delay.)
5. Open the steam valve to take out dry steam (1).
6. Device needs refilling: indicator lamp (4) lights up. For refilling please adhere to chapter 4
Notes for the User, item 1. If the control lamp does not turn off automatically after filling,
please press the temperature limiter (11).
Содержание STEAMY PR
Страница 5: ...5 Device view Backside 1 13 11 5 4 6 7 3 9 10 2 12 14 8...
Страница 19: ...19 EU DIRECTIVE...