CONTENTS
INTRODUCTION
CORRECT OPERATION
•
Inspection Prior To Initial Operation
•
Inspection Before Starting Work
•
Maximum Capacity
•
Notes For Correct Usage
•
Warning
•
Attaching The Load
•
Temperature Range
•
Regulations
•
Inspection/Maintenance
•
Regular Inspections
•
Maintenance/Repair
•
Marking
•
ATEX
•
Language
ASSEMBLY INSTRUCTIONS
VARIANTS AND OPTIONS
•
Wind Up Jack Legs
•
Ratchet Beam Elevation System
•
Customised Configurations
•
PORTA
-GANTRY 5000
•
PORTA
-GANTRY
RAPIDE
DETAILED DIMENSIONS
QUALITY & SAFETY
•
Accreditations
INSPECTION RECORD
500-3000
500-3000
No. 1 in lightweight, portable, safe lifting solutions
2