REID LIFTING porta-gantry 1000 Скачать руководство пользователя страница 1

REID

LIFTING.COM

Assembly & Operation Guide

PORTA

GANTRY

  500-3000

Содержание porta-gantry 1000

Страница 1: ...REIDLIFTING COM Assembly Operation Guide PORTAGANTRY 500 3000...

Страница 2: ...Portable Safe Please read the following instructions and guidance notes carefully before using or operating the system They contain important information about how to handle and use the system in a sa...

Страница 3: ...in rotating parts Traversing the Load Due to a high modulus of elasticity in aluminium when loaded the gantry beams will deflect This is perfectly normal for our products Using aluminium enables us to...

Страница 4: ...ver is lower To be able to effectively and safely move loads above these limits the operator should use the most appropriate mechanical aid For further advice please contact REID Lifting or a qualifie...

Страница 5: ...nt of the system before beginning work When using the product as a fall arrest anchor ensure there is adequate fall clearance when working at height refer to figure C A competent person should calcula...

Страница 6: ...inspections every 6 months for personnel lifting and every 12 months for goods only unless adverse working conditions or profile of use dictate shorter periods The components of the system frame need...

Страница 7: ...ity build up leading to an incentive spark Although the risk of such ignition is unlikely the system must be earthed during assembly and use This can be achieved by attaching an earthing lead to a con...

Страница 8: ...ket 24mm combination spanner 14mm long series allen key 14mm Hex key socket Apply the castor brakes Put brakes on only with protective footwear ensuring that the castors are in the orientation shown T...

Страница 9: ...when gantry is fully erect This avoids a working at height problem when attaching a hoist Keep hands clear of potential Pinch area marked with warning tape in the scissoring system The chain hoist mu...

Страница 10: ...om the center of the beam Beam height adjustment bolts 2 bolts on each upright Tighten all bolts to 27 Nm 20 ft lbs or until spring washers are fully depressed Assembly Instructions Insert and tighten...

Страница 11: ...and stored in a clean and dry manner The jack leg should be lubricated with EP2 grease on the internal thread and gears at regular intervals up to 6 months maximum depending on service conditions Vari...

Страница 12: ...ointed beams together ensuring the internal guide blocks are aligned correctly 2 Connect the chain block to the shackle on the cheek plate as shown Release the load chain until reaching the master lin...

Страница 13: ...guide blocks are aligned correctly 2 Dimensions Beam length Beam adjustment Clear operating span Height to lifting eye Height increment Height to top of beam Width Height to top of roller PORTAGANTRY...

Страница 14: ...27 8 x 200 R 3927 5848 5930 4330 2733 97 82 200 PGAS01000TC1 5829 9 x 200 R 4029 6149 6231 4431 2733 102 82 200 Dimensions mm Frame size Product Code DMax Height to lifting eye E Height increment DMin...

Страница 15: ...nce with the IRATA Code of Practice by doing so contributes to promote the development of safe systems All product names are trademarks of REID Lifting Ltd PORTADAVIT PORTABASE PORTAQUAD PORTAGANTRY R...

Страница 16: ...ystem Ensure the pin is fully engaged 1 Product Number 2 Serial Number 3 WLL 4 Year of Manufacture 5 Standards 6 ATEX 7 Max Moment The system is not suitable for fall arrest applications The system is...

Страница 17: ...The goods capacity WLL of the device The year of manufacture The standards to which the device is approved The ATEX rating of the product if applicable CE Marking Minimum braking load MBL Insert data...

Страница 18: ...35 PORTAGANTRY 500 3000 Notes Notes...

Страница 19: ...nquiries reidlifting com www reidlifting com Printed using environment friendly processes and materials All information herein is copyright protected by REID Lifting Ltd All company and product names...

Отзывы: