background image

2  VERSIONS

2.1 

Box contents

 
1 x

1

2

3

4

Power

rm

BUS

Error

sy

BUS

Fuse

Pump

Boiler

Cool

H%

Master

NO

Pairing

1 x

Fig. 2-1  Box contents

2.2 

Indicators and operating buttons

1

2

3

4

Power

rmB

US

Error

syB

US

Fuse

Pump

Boiler

Cool

H%

Master

NO

Pairing

4 5

10

9

8

7

6

1 2 3

12

11

Fig. 2-2  Indicators and operating buttons

No. Designation

LED

Status

Function

1

Fuse

red

permanent 
on

Fuse has blown

2

syBUS

yellow permanent 

on

Shows syBUS activity

Flashing

Write access on 
microSD-card

3

Error

red

permanent 
on

High temperature limiter 
active

4

Power

green

permanent 
on

Base station ready

5

Pump

green

permanent 
on

Pump output active

6

Boiler

green

permanent 
on

Lights up when boiler 
output is active if the 
boiler relay is used for 
boiler control

7

Cool H%

blue

permanent 
on

Cooling mode active

Flashing

Condensation detected

8

Master

yellow permanent 

on

Base station is defined as 
master

Flashing

Base station is defined as 
slave

9

NO

yellow permanent 

on

Installation is configured 
for NO actuators 
(normally open)

10

Heating zones 
1 - x

green

Shows the respective 
status of the heating/
cooling zones

11

rmBUS button -

Button for the rmBUS 
functionality

12

syBUS button -

Button for the syBUS 
functionality

Tab. 2-1  Indicators and operating buttons

4

Содержание NEA SMART R BASIS 230 V

Страница 1: ...NEA SMART R BASIS 230 V Installation Instructions...

Страница 2: ...First commissioning 9 4 2 Connecting pairing separating base stations 9 4 3 Allocation of a room control unit to a heating zone pairing 10 4 4 Activate test for wireless operation 10 4 5 System config...

Страница 3: ...trical installations must be performed according to the current VDE regulations as well as according to the regulations of your local electric power utility company These instructions are intended for...

Страница 4: ...imiter active 4 Power green permanent on Base station ready 5 Pump green permanent on Pump output active 6 Boiler green permanent on Lights up when boiler output is active if the boiler relay is used...

Страница 5: ...al timer 8 Change over Potential free input according to SELV for external change over signal 9 Dew point sensor Potential free input according to SELV for dew point sensor 10 Actuators 12 connections...

Страница 6: ...ed The wiring of the control system depends on many factors and must be planned and carried out carefully by the installer The following cable sizes are compatible with the terminals solid cable 0 5 1...

Страница 7: ...sensor pump 1 2 boiler 1 2 ECO 1 2 CO 1 2 H 1 2 HZ 1 HZ 2 HZ 3 HZ 4 1 1 1 1 1 1 2 2 2 2 2 2 N N L L TB T4AH Umschalten der Anlage auf K hlen durch Bedienung am RBG H N L Dew point sensor Fig 3 5 Term...

Страница 8: ...N L 1 Fig 3 9 Terminal for high temperature limiter Connecting a high temperature limiter 1 supplied by others When triggered this input cuts the power to the pump and switches the input TL if any ex...

Страница 9: ...done according to the master slave principle Requirements and status messages are exchanged between the units The master unit centrally controls the directly connected functions components CO input ou...

Страница 10: ...he software interface of the Ethernet variant or the Service level of the Nea Smart R room control unit D 4 5 1 System configuration with microSD card Individual settings can be made via the EZR Manag...

Страница 11: ...is used as control output 0 normal 0 reversed 1 135 Minimum running time The minimum running time indicates how long the HP must run until it may be switched off again 30 min min 136 Minimum standstil...

Страница 12: ...ection temperature can be set via the microSD card via the software surface of the Ethernet variant or via the service level of the RBG display parameter 161 5 1 4 Dew point monitoring If the installa...

Страница 13: ...whennocondensationisdetectedanymore Cool Heating zone 0 1 2 3 4 Duration in seconds Wireless connection to the room control unit faulty Changethepositionoftheroomcontrolunitorusearepeateroranactiveant...

Страница 14: ...ch a way that it cannot accidentally be switched on Prior to replacing the fuse and connecting the power again always check the wiring and connected components for any faults Only use the specified fu...

Страница 15: ...ese cannot accidentally be switched live 7 2 Disposal The base stations must not be disposed of with domestic waste The user has the duty to dispose of the units at designated collection points The se...

Страница 16: ...m EE Tallinn 372 6025850 tallinn rehau com ES Barcelona 34 93 6353500 barcelona rehau com Bilbao 34 94 4538636 bilbao rehau com Madrid 34 91 6839425 madrid rehau com FI Helsinki 358 9 87709900 helsink...

Отзывы: