![Regulus RGMAT E W-iPWM Скачать руководство пользователя страница 3](http://html1.mh-extra.com/html/regulus/rgmat-e-w-ipwm/rgmat-e-w-ipwm_installation-and-operation-manual_1434439003.webp)
3
│
3. RGMAT E W-iPWM Connection Diagram
Install the Load Unit respecting the following instructions:
Connect the Load Unit outlet marked
AB
to the piping entering the boiler. Connect the return line from
the heating system to the
A
inlet, and the outlet pipe from the boiler to the
B
inlet via a T-piece. Take
care to install shut-off valves where necessary to avoid draining the whole system for valve cleaning or
replacing the thermostatic element.
When the connecting pipes are not arranged or sloped properly, the thermostatic valve may get
blocked by air inside. This may hinder or even disable its operation.
Always respect valid rules and boiler manufacturer’s data during installation.
Example of possible connection I
Example of possible connection II
The diagram shows a typical
connection of a solid fuel boiler,
thermal store and heating circuit
(with the recommended
CSE MIX W pump station – not
included in supply). If the boiler
is used also for hot water heating,
it is recommended to install
a CSE OTS ZV W pump station
(not included in supply).
The diagram shows a typical
connection of a solid fuel boiler,
combination thermal store and
heating circuit (with the
recommended CSE MIX W pump
station – not included in supply).
Hot water storage tank
RGMAT E W-iPWM
Thermal store
CSE OTS ZV W
CSE MIX W
RGMAT E W-iPWM
CSE MIX W
Combination thermal store