![Regulus BIO 55 MIX W-PWM 1F TRS6K Скачать руководство пользователя страница 8](http://html1.mh-extra.com/html/regulus/bio-55-mix-w-pwm-1f-trs6k/bio-55-mix-w-pwm-1f-trs6k_installation-and-operation-manual_1434428008.webp)
│
8
Procedure for conversion of the load unit to connect the thermal store from
the right
1
Remove the top part of insulation.
2
Loosen the nut and remove the extension
for the outlet to the thermal store (this
will be used in step 8).
3
On the right and left side of the insulation
body there are insulated passage points
for connecting the thermal store; take
out the insulation pieces from both the
passage points.
4
Loosen the nut and turn the elbow to
the right.
5
Take out the insulation piece for the
boiler pump. Loosen the nuts at both the
discharge and suction ports of the pump
so that you can easily handle the pump.
6
Move the pump to the side to allow free
access to the elbow.