Regent Control Systems BC-9461 Скачать руководство пользователя страница 2

Helpline : +91 9624004123

Page - 2

Key Operation

 1)  Press      Key to go next 
      parameter. 

2)  Release the      Key, to save 
     the set point.

3)  Press      Key for manual reset 
     of total length

SET

SET

SET

MADE IN INDIA

Total Batch Count

Batch Count

Press       Key 
  

Press       Key 
   

For Program 

 :

Press       Key 
   

Press       Key 
   

Total Batch Count

Batch Count

Press     Key To save & exit 
 

Press     Key To save & exit 

For Program 

:

Ch -1

1 2 3 4 5 6

1 2 3 4 

9 9 9 9

9 9. 9 9

Ch -2

1 2 3 4 5 6

1 2 3 4 

9 9 9 9

9 9 9 9

s e 

t

 c 

t

 1

r

 l y 

t

 I 

m

s e 

t

 c 

t

 1

s e 

t

 c 

t

 2

Содержание BC-9461

Страница 1: ...y LOWER 4 Digit 7 seg 0 4 green LED Display LOWER 4 Digit 7 seg 0 4 green LED Display BC 7461 1 Relay 1C O 230V AC 5A Technical Specification Connection Diagram MADE IN INDIA TOTAL TOTAL BATCH COUNT Note 1 For NPN Proxi Short pin 3 4 2 For PNP Proxi Short pin 6 5 3 For Microswitch Short pin 6 5 Proxi Connction to 4 6 5 Proxi Connction to 3 4 5 Micro switch Connection to 3 4 7 8 9 10 5 6 L N 1 2 3 ...

Страница 2: ...et of total length SET SET SET MADE IN INDIA Total Batch Count Batch Count Press Key Press Key For Program Press Key Press Key Total Batch Count Batch Count Press Key To save exit Press Key To save exit For Program Ch 1 1 2 3 4 5 6 1 2 3 4 9 9 9 9 9 9 9 9 Ch 2 1 2 3 4 5 6 1 2 3 4 9 9 9 9 9 9 9 9 s e t c t 1 r l y t I m s e t c t 1 s e t c t 2 ...

Страница 3: ...ch setting Always set the value of set 1 less then set 2 When it reaches to set count 1 Relay Buzzer will be ON when it reaches to set count 2 Relay Buzzer will be OFF Batch Count will be zero Note Press key and power on the instrument Display will show parameters SLOW MEDIUM FAST Set Speed Selection by Pressing key SLOW MAX RPM 500 MEDIUM MAX RPM 5000 FAST MAX RPM 15000 Press key to save the para...

Страница 4: ...turn endanger life or cause electrical shock to the operator 3 Circuit breaker or mains switch must be installed between power source and supply terminal to facilitate power ON or OFF function However this mains switch or circuit breaker must be installed at convenient place normally accessible to the operator 4 Use and store the instrument within the specified ambient temperature and humidity ran...

Отзывы: