16
| P36-10 Zero Clearance Direct Vent Gas Fireplace
|
16
installation
Side
Nailing Strips
"C" Screw Position:
For a facing material depth of 1-1/4" (32mm),
the top facing support must be reversed.
UNIT ASSEMBLY
PRIOR TO
INSTALLATION
The Top Facing Support, the Side Nailing Strips
and the 2 Top Standoffs must be correctly
positioned and attached to the top before unit
is slipped into position.
Top Standoff Assembly
The top standoffs are shipped in a flat position
and must be folded into shape and attached.
1) Remove the standoffs from the fireplace top.
2) Take each standoff and bend into the correct
shape. Bend up at the bend lines until the
screw holes in the standoff and the pre-
punched screw holes on the fireplace top
line up.
3) Attach the standoff securely to the top with
2 screws per standoff (on opposite corners).
VENTING
INTRODUCTION
The P36-10 uses the "balanced flue"
technology Co-Axial system. The inner liner vents
products of combustion to the outside while the
outer liner draws outside combustion air into the
combustion chamber thereby eliminating the
need to use heated room air for combustion and
losing warm room air up the chimney.
Note: These flue pipes must not be
connected to any other appliance.
The gas appliance and vent system must be
vented directly to the outside of the building,
and never be attached to a chimney serving a
separate solid fuel or gas burning appliance.
Each direct vent gas appliance must use it's own
separate vent system. Common vent systems
are prohibited.
Top Facing Support &
Side Nailing Strips
Determine the total thickness of facing material
(e.g. non combustible plus ceramic tiles) to allow
the finished surface to be flush with the front of
the unit. Total facing thickness can vary from
1/2" (13mm) to 1-1/4" (32mm) thick.
The Top Facing Support can be mounted in 3
different positions depending on the thickness
of the facing material.
Side
Nailing Strips
2) Fold out the two nailing strips on each side.
1) Mount Top Facing Support using the
3 supplied screws into the three pre-
punched screw holes on the top front of
the unit. Use hole positions A, B, or C
depending on your facing depth.
Screw
Position
Facing Material
Depth
A
1/2" / 13mm
B
7/8" / 22mm
C
*
1-1/4" / 32mm
* For "C" screw position the top facing
support is reversed.