background image

Regency P33-3 Zero Clearance Direct Vent Gas Fireplace

INSTALLATION

GAS LINE 

INSTALLATION

The gas line is brought through the right side of 
the appliance. The gas valve is situated on the 
right hand side of the unit and the gas inlet is 
on the right hand side of the valve.

The gas line connection may be made of rigid 
pipe, copper pipe or an approved fl ex connec-
tor. (If you are using rigid pipe, ensure that the 
valve can be removed for servicing.) Since some 
municipalities have additional local codes it is 
always best to consult with your local authorities 
and the CAN/CGA B149 installation code.

For USA installations follow local codes and/or 
the current National Fuel Gas Code, ANSI 
Z223.1.

When using copper or fl ex connectors use only 
approved fi ttings. Always provide a union so 
that gas lines can be easily disconnected for 
servicing. Flare nuts for copper lines and fl ex 
connectors are usually considered to meet this 
requirement.

Diagram 4

Diagram 3: The upper half of the fl ashing is 

installed under the roofi ng material and not 

nailed down until the chimney is installed. This 

allows for small adjustments.

Diagram 2

VERTICAL 

TERMINATION

1)

  Maintain the 1-1/2" clearances (air spaces) 

to combustibles when passing through ceil-
ings, walls, roofs, enclosures, attic rafter, 
or other nearby combustible surfaces. Do 
not pack air spaces with insulation. Check 
pages 13-17 for the maximum vertical rise 
of the venting system and the 
maximum horizontal offset 
limitations.

2)

  Set the gas appliance in its 

desired location. Drop a plumb 
bob down from the ceiling to 
the position of the appliance 
fl ue exit, and mark the location 
where the vent will penetrate 
the ceiling. Drill a small hole 
at this point. Next, drop a 
plumb bob from the roof to 
the hole previously drilled 
in the ceiling, and mark 
the spot where the vent 
will penetrate the roof. 

3)

  A Firestop spacer must be installed in the 

fl oor or ceiling of every level. To install the 
Firestop spacer in a fl at ceiling or wall, cut 
a 10 inch square hole. Frame the hole as 
shown in Diagram 2 and install the fi re-
stop.

Diagram 4

Note:   Apply sealant "Mill-Pac" to inner pipe 

and high temperature silicone seal-
ant to outer pipe on every twist-lock 
joint.

 

pipe into the vent cap assembly. It is 
important that the vent pipe extends into 
the vent cap suffi cient distance so as to 
result in a minimum pipe overlap of 1-1/4 
inches. Secure the connection between the 
vent pipe and the vent cap 3 sheet metal 
screws. 

9)

  Install wall thimble in the center of the 

10" square and attach with wood screws 
(Diagram 4).

4)

  Assemble the desired lengths of pipe and  

elbows. Ensure that all pipes and elbow 
connections are in the fully twist-locked 
position and sealed.

5)

  Cut a hole in the roof centered on the small 

drilled hole placed in the roof in Step 2. The 
hole should be of suffi cient size to meet 
the minimum requirements for clearance 
to combustibles of 1-1/2". Slip the fl ashing 
under the shingles (shingles should overlap 
half the fl ashing) as per Diagram 3.

6)

  Continue to assemble pipe lengths.

Note:  If an offset is necessary in the attic to 

avoid obstructions, it is important to 
support the vent pipe every 3 feet, to 
avoid excessive stress on the elbows, 
and possible separation.  Wall straps 
are available for this purpose.

 
 

Galvanized pipe is desirable above the roofl ine 
due to its higher corrosion resistance. Continue 
to add pipe sections through the fl ashing until 
the height of the vent cap meets the minimum 
height requirements specifi ed in Dia. 4 or local 
codes.  Note that for steep roof pitches, the 
vertical height must be increased.  A poor 
draft, or down drafting can result from high 
wind conditions near big trees or adjoining 
roof lines, in these cases, increasing the 
vent height may solve the problem.

7)

  Ensure vent is vertical and secure the base 

of the fl ashing to the roof with roofi ng rails, 
slide storm collar over the pipe section and 
seal with a mastic.

8)

  Install the vertical termination cap by twist-

locking it.

Note:  Any closets or storage spaces, which 

the vent passes through must be en-
closed. 

Diagram 1

Important: Always check for gas leaks with a 
soap and water solution or gas leak detector. 
Do not use open fl ame for leak testing.

    Roof Pitch                   Minimum Vent Height

                                           Feet         Meters

fl at to 7/12 

      0.61

over 7/12 to 8/12 

0.61

over 8/12 to 9/12 

0.61

over 9/12 to 10/12 

2.5 

0.76

over 10/12 to 11/12 

3.25 

0.99

over 11/12 to 12/12 

1.22

over 12/12 to 14/12 

1.52

over 14/12 to 16/12 

1.83

over 16/12 to 18/12 

2.13

over 18/12 to 20/12 

7.5 

2.29

over 20/12 to 21/12 

2.44

Содержание P33-LP3

Страница 1: ... in the vicinity of this or any other appliance Installation and service must be performed by a qualified installer service agency or the gas supplier FOR YOUR SAFETY What to do if you smell gas Do not try to light any appliance Do not touch any electrical switch do not use any phone in your building Immediately call your gas supplier from a neighbour s phone Follow the gas supplier s instructions ...

Страница 2: ...teria for Manufactured Home Installations Sites and Communities ANSI NFPA 501A and with CAN CSA Z240 MH Mobile Home Standard in Canada This appliance installation must comply with the manufacturer s installation instructions and local codes if any In the absence of local codes follow the current National Fuel Gas Code ANSI Z223 1 and the current National Electrical Code ANSI NFPA 70 in the U S A a...

Страница 3: ...ore You Start 5 General Safety Information 5 Manufactured Home Additional Requirements 5 Installation Checklist 6 Unit Dimensions 6 HeatWave Duct System Option 6 Locating Your Gas Stove 6 Clearances 7 Combustible Mantel Clearances 7 Mantel Leg Clearances 7 Framing and Finishing 8 Unit Assembly Prior to Installation 9 Venting Introduction 9 Exterior Vent Termination Locations 10 Venting Regency Dir...

Страница 4: ...s open NOTE Regency units are constantly being improved Check the label on the unit and if there is a difference the label on the unit is the correct one SAFETY LABEL For the State of Massachusetts installation and repair must be done by a plumber or gasfitter licensed in the Commonwealth of Massachusetts For the State of Massachusetts flexible connectors shall not exceed 36 inches in length For the...

Страница 5: ...enance 10 Be aware of electrical wiring locations in walls and ceilings when cutting holes for termination 11 Under no circumstances should this ap pliance be modified Parts that have to be removed for servicing should be replaced prior to operating this appliance 12 Installationandanyrepairstothisappliance should be done by a qualified service per son A professional service person should becalledto...

Страница 6: ...agram 1 INSTALLATION LOCATING YOUR GAS STOVE 1 When selecting a location for your stove ensure that the clearances outlined on this page are met 2 Provide adequate clearances for servic ing 3 The appliance must be installed on a flat solid continuous surface e g wood metal concrete Thismaybethefloor orraisedup on a platform to enhance its visual impact If the appliance is going to be installed on ca...

Страница 7: ...imney related fires is failure to maintain required clearances air space to combustible materials It is of the greatest importance that this fireplace and vent system be installed only in accordance with these instructions Clearance to Combustibles from Back 0 0mm Side 0 0mm Floor 0 0mm NOTE The minimum floor clearance must be maintained from the top surface of the carpet ing tile etc Minimum Clearan...

Страница 8: ...urface to be flush with the front of the unit Total facing thickness canvaryfrom1 2 13mm to1 1 4 32mm thick 6 Use steel studs for framing where the 1 1 2 38mm clearance from the vent to combustible material cannot be main tained 2 Frame in the enclosure for the unit with framing material Vertical Termination or Vertical Rise with Horizontal Termination Rear Termination FRAMING AND FINISHING NOTE If...

Страница 9: ...holesonthetopfrontoftheunit Adjust support to desired facing material depth 2 Mount Side Nailing Strip using the 3 sup plied screws into the three pre punched screw holes at the front sides of the unit Adjust support to desired facing material thickness UNIT ASSEMBLY PRIOR TO INSTALLATION INSTALLATION VENTING INTRODUCTION The P33 3 uses the balanced flue technology Co Axial system The inner liner v...

Страница 10: ...on Cap min 6 15cm with Dura Vent Termination Cap 12 30cm H Not to be installed above a meter regulator assembly within 3 90cm horizontally from the centerline of the regulator J Clearance to service regulator vent outlet min 36 90cm K Clearance to non mechanical air supply inlet to building or the combustion air inlet to any other appliance 12 30cm 9 23cm L Clearance to a mechanical air supply inl...

Страница 11: ... P33 3 with a maximum run of 2 feet If installing the P33 with a continuous vent length of more than 2 ft 6m to a maximum of 10 ft 3 0m using Kit 946 515 4 ft or 946 516 10 ft or see page 13 for alternate venting arrangements 1 6 7 8 dia flexible liner 2 ft length 2 4 dia flexible liner 2 ft length 3 spring spacers 3 4 thimble 2 5 AstroCap termination cap 1 6 screws 12 7 tube of Mill Pac 1 8 plated ...

Страница 12: ...mble the vent assembly by applying Mill Pac to the 4 100mm inner collar of the terminationand slippingthe4 100mm liner over it at least 1 3 8 35mm Fasten with the3screws drillingpilotholeswillmakethis easier Apply Mill Pac or high temperature silicone to the 6 7 8 175mm flex pipe and slip it over the 6 7 8 outer collar of the vent terminal at least 1 3 8 35mm and fasten with the 3 screws 4 Separate...

Страница 13: ...g and add 2 inches Flat Wall Installation Max Wall Vent Length Thickness inches Required inches 7 1 4 6 10 1 4 9 13 1 4 12 12 1 4 15 7 8 11 14 5 8 Adj Pipe 18 1 4 25 1 4 11 14 5 8 Adj Pipe Alternate Hori zontal Termi nation Caps This product has been evaluated by Intertek for using a Dura Vent Flue Adaptor in conjunction with Selkirk Direct Temp and Ameri Vent Direct venting systems Use of these s...

Страница 14: ... A N A 90O Elbow Galvinized 990 4DT EL90S 4D90LS 90O Elbow Black 990B 4DT EL90SB 4D90LBS 90O Elbow Swivel Galvinized 990G N A N A 90O Elbow Swivel Black 990BG N A N A Ceiling Support 949 n a from FPI 4DT CS 4DFSP Cathedral Support Box 941 4DT CSS 4DRSB Wall Support Band 988 4DT WS B 4DWS Offset Support 989 n a from FPI 4DT OS N A Wall Thimble Black 942 4DT WT 4DWT Wall Thimble Support Box Ceiling ...

Страница 15: ...n clearances to combustibles Note Must use optional rigid pipe adapter when using rigid pipevent systems Part 510 994 RIGID PIPE VENTING ARRANGEMENTS VERTICAL TERMINATIONS Propane Natural Gas The shaded area in the diagram shows all allowable combinations of straight vertical and offset to vertical terminations using one 90o elbow with rigid pipe vent systems for Propane and Natural Gas ...

Страница 16: ...s The shaded area in the diagram shows all allowable combinations of straight vertical and offset to vertical terminations with rigid pipe vent systems for Propane and Natural Gas Maximum two 45o elbows allowed Vent must be supported at offsets Firestops are required at each floor level and whenever passing through a wall Maintain clearances to combustibles INSTALLATION ...

Страница 17: ...s Horizontal vent must be supported every 3 feet Firestops are required at each floor level and whenever passing through a wall A vent guard should be used whenever the termination is lower than the specified minimum or as per local codes Note Regency Direct Vent System Flex is onlyapprovedforhorizontaltermina tions INSTALLATION Minimum Simpson Dura Vent Center Line Minimum Flex Kit Center Line Impo...

Страница 18: ...Min 6 Max E 5 Min 7 Max F 6 Min 8 Max With these options maxi mum total pipe length is 30 feet with minimum of 6 feet total vertical and maximum 8 feet total horizontal Please note minimum 1 foot between 90o elbows is required With these options max totalpipelengthis30feet with min of 11 feet total vertical and max 9 feet total horizontal Please note min 1 foot between 90o elbows is required Optio...

Страница 19: ... 3 Min 4 Max B 3 Min 2 Max 4 Min 5 Max C 4 Min 3 Max 6 Min 6 Max D 5 Min 4 Max 8 Min 7 Max E 6 Min 5 Max 10 Min 8 Max F 7 Min 6 Max 12 Min 9 Max With these options max total pipe length is 30 feet with min of 12 feet total vertical and max 9 feet total horizontal Please note min 1 foot between 90o elbows is required With these options max total pipe length is 30 feet with min of 6 feet total verti...

Страница 20: ...o elbows One 90o elbow Two 45o elbows With these options max total pipe length is 30 feet with min of 11 feet total vertical and max 7 feet total horizontal Please note min 1 foot between 90o elbows is required Option V H H1 V V1 A 2 Min 3 Max 4 Min B 3 Min 4 Max 6 Min C 4 Min 5 Max 7 Min D 5 Min 6 Max 8 Min E 6 Min 7 Max 9 Min F 7 Min 8 Max 10 Min With these options max total pipe length is 30 fe...

Страница 21: ...various contours which the flexible liner will accommodate However keep the flexible liner as straight as possible avoid unnecessary bending The Air Intake pipe must be attached to the inlet air collar of the termination cap Required Parts Part Description 946 529 Co linear DV Vertical Termination Cap 948 305 3 Flex 35 ft 946 563 Co Axial to Co Linear Adapter Kit which contains the following Co line...

Страница 22: ...Vent Gas Fireplace Venting Arrangements Vertical Terminations with Co linear Flex System for both Residential Manufactured Homes into Masonry Fireplaces The shaded area in the diagrams show the allowable vertical terminations INSTALLATION ...

Страница 23: ...e components 1 Set the unit in its desired location Check to determine if wall studs or roof rafters are in the way when the venting system is attached If this is the case you may want to adjust the location of the unit Rough in the gas preferably on the right side of the unit and the electrical junction block is on the left side on the left 2 Direct Vent pipe and fittings are designed with special...

Страница 24: ...eal ant to outer pipe on every twist lock joint pipe into the vent cap assembly It is important that the vent pipe extends into the vent cap sufficient distance so as to result in a minimum pipe overlap of 1 1 4 inches Securetheconnectionbetweenthe vent pipe and the vent cap 3 sheet metal screws 9 Install wall thimble in the center of the 10 square and attach with wood screws Diagram 4 4 Assemble t...

Страница 25: ... INSTALLATION Incorrectflamepatternwillhavesmall prob ably yellow flames not coming into proper contact with the rear burner or thermopile or thermocouple HIGH ELEVATION This unit is approved in Canada for altitude to 4500 ft CAN CGA 2 17 M91 For Natural Gas installations above 4500 ft follow current CAN CGA B149 1 S I T VALVE DESCRIPTION 1 Gas cock knob 2 Manual high low adjustment 3 Pilot Adjustme...

Страница 26: ...bly to the left and lift out 6 Pull off the pilot cap to expose the pilot orifice 8 Remove burner orifice with a 1 2 wrench and discard Use another wrench to hold on to the elbow behind the orifice 9 ReinstallnewburnerorificeLPstamped 54 and tighten 10 Remove and discard the 3 pressure regula tor mounting screws A pressure regulator tower B and diaphragm C 11 Insure that the rubber gasket D is properl...

Страница 27: ... the logs from the box and unwrap them The logs are fragile handle with care do not force into position 2 Sprinkle the vermiculite and embers around the firebox base Notch Bracket Bracket 250 254 Vermiculite Vermiculite Vermiculite 250 254 The 3 digit numbers i e 250 are molded into the rear of each log Readtheinstructionsbelowcarefully and refer to the diagrams If logs are broken do not use the un...

Страница 28: ...he 5th grate tab 8 Pull off ember size pieces of rockwool and gently place them on the front of the burner trayintheplacesshowninthephotobelow Do not compress the rockwool leave it loose Place rockwool in these 2 locations on the burner tray 251 2 5 2 250 254 2 5 3 250 254 2 5 3 251 2 5 3 250 254 2 5 3 254 252 Cutout 9 Test fire to ensure proper light off make sure flame flows smoothly from one end o...

Страница 29: ...s on the base of the unit dia 1 Secure with 1 screw as per dia 2 Note Top and bottom louvers are different 3 Open the bottom louver Pull the Burner ON OFF control box from inside the bottom of the fireplace and position the slots in the bracket over the 2 screws on the left side of the bottom louver Push down to lock into place Tighten the screws Screws on lou ver bracket Burner ON OFF control box ...

Страница 30: ...tall top louver by sliding the two bracket clips into the brackets located on top of the bay door See below The fitted louver leaves a small gap between faceplate bottom and louver top Bay Louver Top Heat Shield 4 Install bottom louver by sliding the two bracket clips into the brackets located underneath the bay door Secure with 1 screw into each Bottom Louver Mounting Bracket as per diagram below ...

Страница 31: ...rews located on the inside top of the outer frame of the appliance Also remove the center screw b Slide the cut outs in the Top and Bottom Flange of the Full Screen Door Frame under the screw heads which were loosened in step 4a Once the Frame is in place tighten the screws to secure Also re secure the top center screw through the oblong hole 3 Before attaching the Full Screen Door Frame remove th...

Страница 32: ...ng the 2 x 8 Self Tapping Phillips screws provided Bottom Grill Hinge Location 7 Mount the Burner ON OFF Control Box to the left side of the Bottom Grill using 2 x 8 1 4 Philips Head Screws Burner ON OFF Control Box Left Side of Bottom Grill 5 Install the Hinges to the Hinge Brackets on the left and right side of the Bottom Faceplate Bracket seen in step 2 secure using 2 x 8 Self Tapping Philips s...

Страница 33: ... receptacle box protection from extreme heat is very important Run wires from the fireplace to that location Use Thermostat Wire Table 2 Connect the two wires to the gas valve See diagram below CAUTION Do not wire millivolt remote control wires to 120V wire 3 Install3AAAalkalinebatteriesintransmitter and 4 AA alkaline batteries in the receiver Install the receiver and its cover in the wall Switch t...

Страница 34: ...od idea to bring power to the receptacle box provided with the unit in case the fan is installed at a later date CAUTION Labelallwires prior to disconnection when servicing controls Wiring errors can cause improper and dangerous operation Ground Green Neutral Live Black Red Red Minimum Convection Air Temp Switch Ground ON OFF Rotary Speed Control 120V AC 60 Hz Fan Piezo Ignitor To Thermocouple IN ...

Страница 35: ...he left side and 1 screw on the right side Secure left side with 2 screws Secure right side with one screw Secure the 2 boxes together with one screw Hold control box assembly in place and mark the position of the right side slot Diagram 1 Diagram 2 Diagram 3 Use the clip hook on the side of the control boxes to join them together 8 Secure the two boxes together with one screw 9 Position the contr...

Страница 36: ...Regency P33 3 Zero Clearance Direct Vent Gas Fireplace OPERATING INSTRUCTIONS COPY OF THE LIGHTING PLATE INSTRUCTIONS ...

Страница 37: ...g is correct and enclosed to prevent possible shock 3 Check to ensure there are no gas leaks 4 Make sure the glass in the door frame is properly positioned Never operate the ap pliance with the glass removed 5 Verify that the venting and cap are unob structed 6 Ensure that the brick panels are installed 7 Verify log placement If the pilot cannot be seen when lighting the unit the logs have been in...

Страница 38: ...so check mechanical supports such as Wall Straps or plumbers tape for rigidity GOLD PLATED or BRASS LOUVERS TRIM The 24 carat gold plated or brass finish on the louvers and trim requires little maintenance and need only be cleaned with a damp cloth DO NOT use abrasive materials or chemical cleaners as they may harm the finish and void thewarranty Cleananyfingerprintsoffbefore turning the unit on LOG ...

Страница 39: ...ed dealers Do not use abrasive materials Do not clean the glass when hot In the event that you break your glass by impact purchase your replacement from an authorized Regencydealeronly andfollowourstep by step instructions for replacement Flush Glass Replacement Remove the flush door front Remove the 4 glass clips from each corner Slide in the new replacement glass Push the 4 glass clips back onto ...

Страница 40: ...tthermocouple nut with a 9mm wrench 6 Reconnect the pilot tube nut with a 7 16 wrench 7 Scrapeofftheoldgasketfromthefloorofthe firebox and from the valve tray assembly 8 Install a new gasket and reinstall the valve tray assembly Note Failure to install a new gasket may severely affect the appliance per formance 9 Reinstall the 10 hold down screws 10 Hook up the 2 TP and 2 TH wires to the appropriate...

Страница 41: ...nel Top 37 430 056 Brick Clip Top 38 430 057 Brick Clip Bottom 432 945 Herringbone Brick Panel Set Optional 902 359 Brick Panel Rear 902 358 Brick Panel Left Side 902 360 Brick Panel Right Side 902 361 Brick Panel Top 432 917 Fan Assembly 120 Volts Optional 42 910 331 P Fan Motor 120 Volts 432 966 Fan Switch Assy 120 Volts 43 910 813 Power Cord 120 Volts 46 910 330 Fan Speed Control 47 904 586 Kno...

Страница 42: ...Regency P33 3 Zero Clearance Direct Vent Gas Fireplace PARTS LIST ...

Страница 43: ...Valve Natural Gas 910 380 S I T Valve Propane 58 Valve Bracket 59 Firebox Base 60 Valve Tray 66 910 038 Pilot Assy 3 way flame S I T NG 910 039 Pilot Assy 3 way flame S I T LP 904 568 Orifice 44 Natural Gas 904 163 Orifice 54 Propane 936 170 Orifice Gasket 67 Pilot Holder 68 W840470 Pilot Assembly Gasket 79 433 525 Burner Assy NG LP 82 433 024 Burner Grate Assembly NG LP 83 Rear Log Support Bracket NG ...

Страница 44: ...Assy Top 430 162 Front Deflector 134 Flush Louver Assy Bottom 433 538 Flush Door Assembly Complete 135 940 088 P Glass Flush 137 904 691 U Clip 139 936 155 Glass Gasket Tadpole 140 948 042 Spring Hinge Black 430 940 Finishing Trim Set Black Option 430 942 Finishing Trim Set Brass Option 157 Finishing Trim Left 159 Finishing Trim Right 158 Finishing Trim Top 431 943 Double Screen Door Complete Optio...

Страница 45: ... Louver Hold Down 120 400 189 Glass Retainer 432 956 Bay Door Trim set Gold 432 954 Bay Door Trim set Brass 432 958 Bay Door Trim set Brushed Steel 123 Bay Door Trim each Black 430 932 Bay Louvers set Gold Black 430 934 Bay Louvers set Brass Black 430 936 Bay Louvers set Black 430 937 Bay Louvers set Steel Black 125 Bay Louver Assy Top 433 026 Bay Door Deflector 126 Bay Louver Assy Bottom 129 948 0...

Страница 46: ..._____________________ ___________________________________________________ ___________________________________________________ ___________________________________________________ ___________________________________________________ ___________________________________________________ ___________________________________________________ ___________________________________________________ ______________...

Страница 47: ...and inspected by an authorized dealer within three days of installation Reported damage after this time will be subject to rejection It is the general practice of FPI to charge for larger higher priced replacement parts and issue credit once the replaced component has been returned to FPI and evaluated for manufacturer defect The authorized selling dealer is responsible for all in field service wor...

Страница 48: ...___________________________________ Printed in Canada Regency fireplace products are designed with reliability and simplicity in mind Inaddition ourinternalQualityAssurance Team carefully inspects each unit thoroughly before it leaves our door FireplaceProductsInternational Ltd is pleased to extend this Limited Lifetime Warranty to the original purchaser of a Regency Product See the inside back cov...

Отзывы: