Regency P121-1/P121LC-1/P121RC-1/P131-1 Zero Clearance Direct Vent Gas Fireplace
10
B
C
A
FRAMING AND FINISHING
CAUTION: The unit does not have to be completely enclosed in a
chase. The clearance on top of the unit is 0" to the standoffs so
combustible building materials can be laid directly on top of the
standoffs. You must maintain clearance from the vent to combustible
materials for both rigid and fl ex, see Vent Clearances, page 9.
P121-1 - See Thru
P131-1 - Pier
Framing Dimensions
P121-1 (See Thru) P131-1 (Pier)
P121LC-1 / P121RC-1
(Corner
Unit)
A
25"(635mm)
25"(635mm)
26-13/16"
minus two times
minus two times
minus one time
the fi nishing
the fi nishing
the fi nishing
material thickness* material thickness* material thickness*
B
42-1/2"(1080mm) 42-1/2"(1080mm)
42-1/2"(1080mm)
C
46-3/4"(1187mm) 45" (1143mm)
45"(1143mm)
minus one time
minus one time
the fi nishing
the fi nishing
material thickness* material thickness*
Note: These units are
non-load bearing.
P121LC-1 - Corner Unit
* Finish material thickness includes: drywall, ceramic tile, slate, etc.
1) For ease of installation, frame your fi replace after it is positioned and
the vent system is installed. Remember to install the top standoffs.
See page 11 for assembly. Use 2x4's and frame to local building
codes.
2) When locating your appliance on an exterior wall or in a chase, apply
a vapour barrier and drywall, as per local building codes.
DO NOT
INSULATE THE FIREPLACE ITSELF.
CAUTION: Verify your fi replace dimensions, framing methods and
fi nished wall facing details before framing. Determine the total
thickness of facing material - drywall plus ceramic tiles, slate, etc.
Allow the fi nish surface to be fl ush with the front or side of the
unit. Total facing thickness can vary from 1/2" (13mm) to 1-1/4"
(32mm) thick.
P121RC-1 - Corner Unit
INSTALLATION