background image

7

U20/E21 Gas Insert Zero Clearance Kit

Variable Chimney Routes

VENTING

1) This fireplace must be vented with a 4" (100mm)

diameter Class “B” vent. The installation of the
venting system must conform and be in accordance
with the natural gas installation code CAN/CGA -
B149 (Canada), ANSI Z223.1 (U.S.A.), AG 601
(Australia), and NZS 5261 (New Zealand).  Minimum
chimney height from base of fireplace must be at
least 12 feet (3.7m).

2) Masonry Chimney Installation:

This application can be connected to a masonry
chimney flue.  Make sure the masonry chimney is
clean and in good working order.  When an existing
masonry chimney is unlined and local experience
indicates that gas condensation may be a problem
or if local codes dictate, an approved liner should be
installed.  Use “B” Vent to bridge the gap between the
fireplace and the masonry chimney. To ensure
proper flue sizing and operation it is recommended
that the masonry chimney be lined with an approved
aluminium chimney liner of the same diameter as the
“B” Vent.  Make sure connection between “B” Vent
and masonry is completely sealed.  Flue pipe exposed
to cold air should be insulated in a chase. If
condensation occurs, a trap should be installed at
bottom of flue.

Use a maximum of two offsets; four 45

o

 elbows, or two

90

o

 elbows for example. Slope horizontal pipe at least

1/4" (6.4 mm) rise per foot of run. Horizontal runs
should not exceed the vertical rise. Keep horizontal
runs to a minimum.  See chart below.

NOTE:  Cold Climate Installation

When this appliance is to be installed against a non-
insulated wall or in a chase, fibreglass insulation should
be installed around the body of the fireplace.

Note: The draft hood must be installed parallel to the

fireplace opening, as shown below.  See
Instructions in U20/E21 Installation Manual.

Install stove insert as per U20/E21 Installation Manual,
see also page 8.

INSTALLATION

Содержание Energy E21

Страница 1: ...n adjustment alteration service or maintenance cancauseinjuryorpropertydamage Refertothismanual Forassistance or additional information consult an authorized installer service agency or the gas supplier FOR YOUR SAFETY Donotstoreorusegasolineorother flammable vapours and liquids in the vicinity of this or any other appliance Installation and service must be performedbyanauthorizedinstaller service...

Страница 2: ... Specifications 3 General Information 4 Parts 4 Clearances to combustibles 4 Locating Your Fireplace 5 Framing 5 Kit Assembly 6 Venting 7 Insert Installation 8 Optional Outside Combustion Air Supply Installation 9 Gas supply line 9 Electrical Supply 9 Faceplate Trim Installation 10 Zero Clearance Top Louver 11 Finished Facing Notes 11 ...

Страница 3: ...ion in the United States Canada Australia and New Zealand as described in these Installation and Operating Instructions Check with your local building code agency before you begin your installation to ensure compliance with local codes including the need for permits and follow up inspections If any problems are encountered regarding code approvals or if you wish clarification on any of the instruc...

Страница 4: ...elow after it is installed in the Zero Clearance Kit Clearances to Combustibles for Insert The minimum clearance from the side of the appliance to a combustible side wall is 9 inches 229mm See the Mantel Clearances chart Diagram 2 for the minimum clearance from the bottom of the Top Faceplate to a combustible mantel The minimum height from the bottom of the Top Faceplate to the ceiling is 36 inche...

Страница 5: ...his unit is not approved for installation into a mobile home FRAMING 1 The trim kit allows for 1 2 13 mm of finish facing material The kit may be installed directly on and or against standard combustible building materials 2 Frame in the Zero Clearance box for the Kit with framing material Theframedopeningfortheassembledkitis29 3 4 756mm high x 30 25 768mm wide x 16 5 419mm 17 432mm includingdrywa...

Страница 6: ...crew each side NOTE the Side flanges are on the outside Back flanges are on the inside 3 Lift the Back Side Assembly onto the Base position as shown in the diagram The Back and Sides rest on the Base with the Base flanges on the outside Fasten the Back to the Base 3 screws and the Sides to the Base 2 screws for each side 4 Attach the top assembly with the top flanges on the outside of the Sides an...

Страница 7: ... masonry chimney To ensure proper flue sizing and operation it is recommended that the masonry chimney be lined with an approved aluminiumchimneylinerofthesamediameterasthe B Vent Make sure connection between B Vent andmasonryiscompletelysealed Fluepipeexposed to cold air should be insulated in a chase If condensation occurs a trap should be installed at bottom of flue Useamaximumoftwooffsets four...

Страница 8: ...od slide plate is screwed in that it is the same height as the draft hood guides or it will not slide into position Note Donotoperateunitifdrafthoodisnotfastened in original position 5 Slide the gas insert in all the way back using the draft hood guides Draft hood must be in original position and replace the screw holding the draft hood 6 Make the final gas and electrical connections as per the In...

Страница 9: ...22 mj h Propane 11 w c 21 000 Btu hr 2 74 kPa 22 mj h ELECTRICAL SUPPLY Provide 120 VAC 60 Hz in Australia and New Zealand 240 VAC 50Hz receptaclewithin24 610mm oftheleftsideoftheappliance not inside the Zero Clearance Cabinet Plug the cord on the appliance into the receptacle GAS SUPPLY LINE An authorized service person should install the gas line in accordance with all local building codes If co...

Страница 10: ...t this point do a trial fit to the unit Make any necessary adjustments and when it fits properly then tighten down the screws 3 Using the trim clips provided join the left side trim with the ON OFF switch to the top trim See diagram 2 Connect the right side trim to the top trim 4 Place the trim on the assembled faceplate panels aligning the wire connections from the switches with the notch on the ...

Страница 11: ...oles in the bottom left corner of the faceplate Note This faceplate and Hearth Trim Assembly replacesthestandardAssemblyasshown in the U20 E21 Installation Manual FINISHEDFACING NOTES Install finished facing surface of 1 2 13mm thickness on framing Drywall 1 2 13 mm thick can extend flush with the appliance on all three sides of the front face The height at which the mantle must be installed above...

Страница 12: ...Printed in Canada ...

Отзывы: