MOUNTING OF ADMIRAL/VISION/JANUS LIGHT CURTAINS  

  Remove the cover (with spirit level) from the top of the column; 

  Insert the allen screws

 (A) 

in the holes of the column 

fig.2 step 1

;  

  Turn the allen screws once to the tapped metal plates 

(B)

 fig.2 step 2

  Insert the barrier from the top into the column, (make sure that all the tapped metal plates slide in the slot on 

the back of the barrier, 

fig.2 step 3

); 

  When correct position achieved, 

(see table 1)

 lock the allen screws

 

to fix the barrier.  

  Fix the cover on the top of the column.  

 

 

 

 

 

Figure 2 

 
 
 

• 

You  will  find  the  exact  position  of  the  barrier  in  the  table  below  (distance  

 

between the first light beam and the ground) (according to EN999). 

 

MODEL 

Distance between the first 

light beam (red LED) and the 

ground [mm]

 

FMC-B2

 

≤ 400 

FMC-B550 

FMC-B3 

FMC-B4 

FMC-B1700 

FMC-B2000

 

≤ 300 

Table 1

 

Figure 3 

Содержание FMC-B2

Страница 1: ...CB FMC CBL FIGURA 1 Fissare al terreno la base per colonna FMC CB FMC CBL rif foglio istruzioni della base N B Al fine di ottenere un corretto allineamento verificare che la superficie superiore della...

Страница 2: ...l alto facendo in modo che tutte le piastrine precedentemente predisposte entrino nella scanalatura della barriera fig 2 passo3 Raggiunta la posizione desiderata tabella 1 serrare le viti che bloccher...

Страница 3: ...per tale controllo si consiglia di utilizzare una livella a bolla posta sul coperchio superiore della colonna A Le regolazioni di livellamento verranno effettuate agendo sui tre dadi esagonali B Alim...

Страница 4: ...femmina volante attraverso il raccordo plastico PG11 predisposto nella colonna figura 5 Figura 5 DIMENSIONI Figura 6 RACCORDO PLASTICO PG11 MODELLO FMC B2 FMC B3 FMC B4 FMC B2R FMC B3R FMC B4R QUOTA A...

Страница 5: ...ns MOUNTING ON THE FMC CB FMC CBL STAND BOTTOM Fig 1 Mount the FMC CB FMC CBL stand bottom on the floor see mounting instruction for stand bottom Please note For a correct alignment please verify that...

Страница 6: ...make sure that all the tapped metal plates slide in the slot on the back of the barrier fig 2 step 3 When correct position achieved see table 1 lock the allen screws to fix the barrier Fix the cover...

Страница 7: ...placing a spirit level A on the top end of each stand Perform leveling fine adjustments by means of the hexagonal nuts of the stand bottom B Connect the light curtain the light grid ref Curtain techn...

Страница 8: ...ic fitting housed in the column figure 5 Figure 5 DIMENSIONS Figure 6 PLASTIC FITTING PG11 SPIRIT LEVEL MODEL FMC B2 FMC B3 FMC B4 FMC B2R FMC B3R FMC B4R DIMENSION A mm 1000 1200 1330 DIMENSION B mm...

Отзывы: