
reedinstruments
www
com
3
Operating Instructions
Maintenance
• Always keep instrument dry
• Prevent dirt from getting in between the measuring electrodes
• How to change the electrodes: Unscrew the 5 screws at the back of
the instruments. Remove housing lid. Unscrew all 5 screws on the elec-
tronic plate. Replace the electrodes. Reinstall the housing lid and screw
the 5 screws back in place.
Function Check
“O------
T------O”
Connect electrodes with T contacts to the protective cap.
Reference display for wood: 27%±2%
Reference display for building material: 1.25%±0.1%
When you encounter a Function error you will need to send the instrument
for servicing.
REED Instruments can service this instrument for you, for information e-
mail [email protected]
Getting Started
• Remove the cap from the top side and place on the bottom side. The
instrument switches on automatically.
• Press the measuring electrodes as far as possible into the material.
• Always measure the moisture in the wood perpendicular to the fibre
structure.
• Repeated measuring yields representative measured data.
• Once the measurement is finished, reattach the cap on the top side and
the instrument switches itself off.
1.888.610.7664
REED-Direct.com