REED PES1 Series Скачать руководство пользователя страница 2

 

 
 

PES1 Operating Instructions

 

 

 

PES1IPS #04290 

PES1CTS #04292

Capacity: ½” to 1” 

1.  Follow safety procedures. 
2.  Determine pipe/tube size and wall thickness.  Set 

stops for over-squeeze protection. 

3.  Insert ground probe into moist soil (for gas 

applications). 

4.  Raise the Top Crimp Bar by turning the Feed Screw. 
5.  Center the squeeze-off tool on and square to pipe. 
6.  Turn the feed screw to compress the pipe at a slow 

rate with momentary pauses to allow stress 
relaxation in the pipe to occur.  This is particularly 
important in cold weather. 

7.  Squeeze the pipe until flow is controlled or top bar 

contacts the stops.  

 

 

 
Tool Removal 

1.  Maintain a release rate of ½ inch per minute to 

prevent damage to pipe as recommended by ASTM 
F1041. 

2.  Rotate the tool 90

°

 and re-apply force to re-round 

pipe. 

3.  Inspect squeezed section for damage before 

covering. Procedures should be followed that 
prevent squeezing the same area of the pipe again. 

 
 
 
 
 

 

12/02     54290 

 

Reed Manufacturing Co. 

                                                                                 

1425 West 8

th

 St. 

                                                     

                                    

Erie, PA 16502 USA 
 
 
 
 

Phone:  800-666-3691 or 814-452-3691 

Fax:  800-456-1697 or 814-455-1697 

www.reedmfgco.com

 

 
 
 
 

 

 

 

 

 

Capacity: ½” to 1” 

1.  Follow safety procedures. 
2.  Determine pipe/tube size and wall thickness.  Set 

stops for over-squeeze protection. 

3.  Insert ground probe into moist soil (for gas 

applications). 

4.  Raise the Top Crimp Bar by turning the Feed Screw. 
5.  Center the squeeze-off tool on and square to pipe 
6.  Turn the feed screw to compress the pipe at a slow 

rate with momentary pauses to allow stress 
relaxation in the pipe to occur.  This is particularly 
important in cold weather. 

7.  Squeeze the pipe until flow is controlled or top bar 

contacts the stops.  

 

PES1 Operating Instructions

 
 

PES1IPS #04290 

PES1CTS #04292 

 
Tool Removal 

1.  Maintain a release rate of ½ inch per minute to 

prevent damage to pipe as recommended by ASTM 
F1041. 

2.  Rotate the tool 90

°

 and re-apply force to re-round 

pipe. 

3.  Inspect squeezed section for damage before 

covering. Procedures should be followed that 
prevent squeezing the same area of the pipe again. 

 
 
 
 
 

12/02     54290 

 

Reed Manufacturing Co. 

                                                                                 

1425 West 8

th

 St. 

                                                     

                                    

Erie, PA 16502 USA 
 
 

Phone:  800-666-3691 or 814-452-3691 

Fax:  800-456-1697 or 814-455-1697 

www.reedmfgco.com

 

 

Отзывы: