Reece SUSSEX POL Скачать руководство пользователя страница 2

SUSSEX

POL FLOOR MOUNT MIXER CURVED

INSTALLATION INSTRUCTIONS

Plumbers, please ensure a copy of the installation 
instructions is left with the end user for future reference

Rough in Plumbing

- 3/8” Copper Tube is to be used to connect to the “Push-on” fittings of this 
  Floormount Mixer.
- The clearance hole size through the finished floor is to be between 28 - 32mm. 
- The Hot and Cold Copper Tube lines should be installed with 18mm centres.
- Use the template provided to gain correct spacing between the Copper Tube and 
  for the direction of the spout .
- The Hot and Cold 3/8” Copper Tube must be trimmed to protrude through the 
  finished floor surface by 25-30mm.
- The Copper Tube must be vertical and central within the floor penetration.
- Brace/Secure the 3/8” Copper Tube lines to prevent movement when installing 
  the mixer.
- The Copper Tube ends must remain round and completely de-durred (free from 
  any sharp edges).
- Note: Where possible, it is recommended to fit isolating valves.

Installation of Mixer

- Place template over the protruding 3/8” Copper Tube to mark fixing hole 
  positions, remove and drill to suit appropriate fasteners. (Fasteners not included)
- Drilling Template must be removed prior to fit off.
- Unscrew Cover flange and gently slide away from the Floor Fitting.
- Note: Finished floor surface must be completely sealed and water tight around 
  copper tube ends prior to final fit-off.
- Apply grease to Copper Tube ends and gently attach the “Push On” Fittings. Full 
  engagement is approx. 20mm. 
- Lower Mixer and align the Floor Fitting.
- Ensure “FRONT” of mixer body is facing the bath.
- Perform a water test before permanently fixing Mixer to floor.
- Secure to floor and check with level ensuring mixer is square.
- Where required, level mixer by adjusting the 4 jacking screws located in the Floor
  Fitting.
- Gently lower the Cover Flange onto the Floor Fitting and hand tighten.
- Check Mixer operation.

Tapware is to be installed by a Licensed 
Plumber in accordance with AS/NZL 3500

Water pressure is not to exceed 750 Kpa
Recommended working water pressure 300 - 500 Kpa.
Maximum water temperature is 55 deg.C.

TEMPL ATE

18mm Centres

Fixing Hole positions

 (4 Places)

3/8" Copper Tube

Positions

Spout

Direction

    Floor 

Clearance

  Hole size

28 - 32m m

H C

 

 

H C

3/8"  

Copper Tube

25 - 30 mm

 

28 - 32mm Floor Clearance Hole

The Copper T ube ends must remain round and

Cover 

Flange

Floor Fitting 

(Do Not Remove)

"Push On"

Fittings

Finished Floor

Surface

FRON T

page 2 of 3

Отзывы: