Reece Kado Lussi MKII Скачать руководство пользователя страница 4

Kado Lussi MKII Heated Towel Rail 

Installation Instructions

Electrician, please ensure a copy of the installation
instructions is left with the end user for future reference

Page 5 of 7

Kado Lussi Heated Towel Rail Wall Mount  

HARD WIRING

We 

recommend

 

that all hard-wired heated towel rails 

be connected to a light switch or digital timer. Connecting hard-
wired heated towel rails to a light switch or a timer will prolong the 
life 
of the electric element and reduce energy consumption.

CHANGING ELEMENTS

Replacing a heating element, or exchaging it from one side to the 

other is a realtively simple process.

There are Five Basic Steps:

1. Remove towel rail from brackets (if already installed).

3. Pull element cable back through vertical rail so that it protrudes 

from bottom. With a 19mm tap spanner, loosen

the hex nut of the electric element. When the element is 

, unscrew it by hand. If you are changing the element 

from left to right (or vice versa) the internal plug on the 
opposite side must also be removed and swapped over with the element. 

loose

4. Swap the element and screw in place.

5. Turn the towel rail the right way up and position back into 

brackets, re t grub screws to secure.

Element

on left side

Turn rail

upside down

Swap

element over

Element

on right side

2.

3.

4.

- 19mm Tap Spanner

Required

unscr

ew in

ter

nal cap

unscr

ew elemen

t

scr

ew in elemen

t

scr

ew in in

ter

nal cap

2. Turn towel rail upside down and remove both push on caps 

from bottom of vertical tube.

1.

Please note:

We 

advise that the unit be removed from the wall and turned 

upside down to avoid water spilling. Please ensure

the heating element always remains at the bottoom of the towel rail. 

Remo

ve push on caps

Refit push on caps