Reece ISSY GLIDE 750 Скачать руководство пользователя страница 4

by 

OPEN SKY DESIGN

ISSY

GLIDE VANITY UNIT

INsTALLATIoN INsTRUCTIoNs

Vanity should be installed by a qualified, licensed trades person.

Vanity Fitting Instructions

• Prior to installation it is important to inspect the vanity to ensure no damage has occurred in transit.  If damage

has occurred, or a visible defect exists, do not proceed with installation and advise supplier immediately. No
warranty claim for damage will be accepted if the vanity is installed.

• It is recommended that the Solid Surface Top is protected during installation.

Please Note:

 

 Manufacturer will not be liable for the cost of installation or removal of the vanity and the warranty 

will be voided if damage occurred during or after installation.
• Remove drawers (refer to Drawer Installation and Adjustment Instructions)
• Mark base and back of the vanity for drilling to allow for plumbing pipes.
• Drill holes for pipes with appropriate size hole saws.
• Position vanity over pipes in correct position.
• It is recommended that the vanity sit on a length of aluminium angle securely fastened to the wall
• Check with spirit level that the vanity is completely level.
• Screw vanity to the wall through back of the vanity, ENSURING SCREWS ARE FIXED TO STUDS.  Allow

enough fixing points at the top and bottom of the back panel to sufficiently secure the unit to the wall.

• All edges where vanity top and cabinet meet wall and floor are to be properly sealed with bathroom grade sili-

cone to prevent water penetration. Materials used in construction are water-resistant not waterproof.  Care must
be taken to dry any spillage or leakage of water which may gain access to the cabinet when fitting.

• Replace drawers (refer to Drawer Installation and Adjustment Instructions).

Recommendation for Plumbing

Waste should not be over tightened to avoid stress on basin and top.

PLUmBING AND ELECTRICAL sEToUT INsTRUCTIoNs

1. Diagrams below show wall positions of 40mm waste pipe , hot and cold outlets (if required) and power cord

outlet (if required). Please note diagrams show set outs for 750 , 1200 and 1500 left hand basin , for right hand
basin use mirror opposite .

2. Use 40mm plug and waste , non overflow with 40mm Short Inlet P Trap (both not supplied)
3. For power cord positioning of custom sizes , contact manufacturer .
4. Plumbing set outs  for customised sizes:

751 - 850  same as for 750 set out 
1000 -  1300  same as for 1200 set out 
1400 - 1499  same as for 1500 set out

5. For plumbing and electrical set outs of customised 1751 - 2000mm double basin contact manufacturer .
6. Sensor Powered Drawers

A 1.6 mtr power cord extension is fitted to the vanity and extends out the back of the unit at the position
shown in the diagram below. This power cord should be connected by a qualified electrician to a 240 volt
power supply with an isolating switch.

Please Note:

 Any electrical fault caused by water penetration inside the vanity is not covered by the product

warranty

7. If using a basin mixer, hot and cold hoses should be bracketed to the side or back of the vanity so as not to

impede operation of the drawer.

Plumbers, please ensure a copy of the installation 
instructions is left with the end user for future reference

page 4 of 6

Содержание ISSY GLIDE 750

Страница 1: ...ised 751 850mm 1200 2 Drawer Can Be Customised 1000 1300mm 1500 2 Drawer Can Be Customised 1400 1499mm 1750 4 Drawer Double Basin Can Be Customised 1751 2000mm Colour Variations Satin or Gloss White Metallic Silver Gloss or Metallic Charcoal Gloss Oak drawer fronts with matte clear finish satin white base and end panels Fixing Bolted Screwed to Wall by a Licensed Trades Person Vanity Unit Material...

Страница 2: ...by OPEN SKY DESIGN GLIDE 750 245 255 300 230 750 500 GLIDE 1200 245 255 300 260 1200 500 70 70 85 85 page 2 of 6 ...

Страница 3: ...by OPEN SKY DESIGN GLIDE 1500 245 255 300 260 1500 500 GLIDE 1750 DOUBLE BASIN 245 255 320 260 260 1750 500 85 85 85 85 85 85 page 3 of 6 ...

Страница 4: ...s used in construction are water resistant not waterproof Care must be taken to dry any spillage or leakage of water which may gain access to the cabinet when fitting Replace drawers refer to Drawer Installation and Adjustment Instructions Recommendation for Plumbing Waste should not be over tightened to avoid stress on basin and top Plumbing and electrical setout instructions 1 Diagrams below sho...

Страница 5: ... 100 85 Glide 1200 Front Elevation 740 260 Vanity Top 150 80 240 140 100 Glide 1750 Front Elevation 595 260 Vanity Top 150 80 260 150 80 260 140 100 Key 300 Glide 1500 Front Elevation 860 260 Vanity Top 150 80 240 140 100 PLEASE NOTE Diagrams show setouts for left hand basin For right hand basin use mirror opposite page 5 of 6 ...

Страница 6: ... drawer Note Only available on 122mm drawer sides REFITTING DRAWERS It is important that the drawers are refitted correctly if removed for installation If the drawer is not locked into the runner system at all four corners the drawer will not function correctly Please follow the Install Instructions for fitting the drawer then check the drawer is correctly locked onto the runner by carrying out th...

Страница 7: ...Normal wear and tear Inadequate or complete lack of maintenance Chemical electrochemical or electrical influences Harsh detergents or abrasive cleaners used on product finishes 1 YEAR WARRANTY COMMERCIAL USE Commercial use is all use other than for normal domestic residential purposes including use in non business places as in public buildings schools sports centres and in establishments that cont...

Страница 8: ...adequate or complete lack of maintenance Chemical electrochemical or electrical influences Harsh detergents or abrasive cleaners used on product finishes Powe surges Water penetration damage 1 YEAR WARRANTY COMMERCIAL USE Commercial use is all use other than for normal domestic residential purposes including use in non business places as in public buildings schools sports centres and in establishm...

Отзывы: